# Developing an Aircraft Maintenance Programme under Part-M

> Online course for CAMO engineers: build a Part-M aircraft maintenance programme from the MRB report and MPD, get it approved and keep it current.

- Course code: AMP-DEV-M
- Authorised by: [Dionysios Kefalas](https://aviocourse.aero/authors/dionysis-kefalas.md)
- Price: €99.00 per seat + VAT where applicable
- Estimated learning time: 7.5 hours
- Final exam: 12 questions, 18 minutes (90 seconds per question)
- Pass mark: 75%
- HTML syllabus: https://aviocourse.aero/courses/AMP-DEV-M
- Free lesson preview: https://aviocourse.aero/courses/AMP-DEV-M/preview

Develop a Part-M aircraft maintenance programme using worked records from a fictional regional twin-turboprop fleet. Trace tasks to their sources, determine which aircraft they apply to and set their limits. Use M.A.302 and Appendix I to AMC M.A.302 and AMC M.B.301(b) to draft programme entries, prepare an approval submission and put approved changes into use. Work through a lease-in, an interval escalation, a reliability alert and the annual review, then audit the programme against planning and maintenance records. The course includes documented accident cases, ungraded practice and a timed final exam.

Audience: CAMO maintenance-programme and technical-services engineers, continuing airworthiness managers, reliability engineers, airworthiness review staff and compliance staff who build, approve, amend or audit Part-M aircraft maintenance programmes; the course develops one programme for a new turboprop fleet from its sources to its first annual review.

This online aviation training course can be bought for a team or for yourself. It records progress, ends with a timed final exam and issues a certificate after passing.

Check each course’s stated references, scope and revision. Regulatory courses identify their applicable framework. International comparison guides identify the official sources reviewed on 2026-09-11; local acceptance remains subject to your organisation’s training programme.

## Regulatory baseline incorporated

Regulation (EU) No 1321/2014, Articles 1–3, Annex I (Part-M), including M.1(3), M.A.201, M.A.301–M.A.307, M.A.403, M.A.503, M.A.803, M.A.901–M.A.903, M.A.905–M.A.906 and M.B.301, and selected provisions of Annex II (Part-145, including 145.A.45, 145.A.48, 145.A.50, 145.A.55 and 145.A.60), Annex Vc (Part-CAMO, including CAMO.A.150, CAMO.A.160 and CAMO.A.315) and Annex Vd (Part-CAO). Read with Implementing Regulation (EU) 2026/100 for the airworthiness review, transfer and occurrence reporting amendments, and with Annex III point (1) of Implementing Regulation (EU) 2023/989 for M.A.302(d)(3). Guidance includes AMC and GM to M.A.302, AMC M.B.301, their Appendix I as published under ED Decision 2023/013/R, and AMC1 M.A.905(c) in ED Decision 2026/005/R, corrected Part-M Amendment 10. Related sources include Regulation (EU) No 748/2012 (Part 21 and relevant Part 21 Light provisions), Part-26 points 26.201 and 26.300–26.370 of Regulation (EU) 2015/640, selected Part-CAT and Part-SPA provisions of Regulation (EU) No 965/2012, including CAT.GEN.MPA.195 and CAT.POL.MAB.100, Regulation (EU) No 376/2014 and Implementing Regulation (EU) 2015/1018 as amended by Implementing Regulation (EU) 2026/1821. Design and programme guidance includes CS-25 Appendix H (Amendment 28), historical AMC 25-19 (Amendment 4) for legacy certification maintenance requirements and the later AMC 25-19, AMC 20-20B, the EASA aircraft maintenance programme user guide UG.CAMO.00010-002 and checklist TE.CAMO.00011-002.

This exact baseline is recorded on the certificate issued for this course revision. Check the applicable regulation and EASA publications for material issued after this baseline.

## Syllabus

15 lessons, completed in order.

1. The aircraft maintenance programme and the rules that shape it
  - Keywords: aircraft maintenance programme, Article 3, M.A.201, M.A.301, M.A.302, CAMO.A.315
  - Objective: Explain which aircraft need a Part-M maintenance programme and assign responsibility for developing, approving, using and reviewing it.
2. Where scheduled maintenance tasks come from
  - Keywords: instructions for continued airworthiness, MSG-3, failure effect category, Maintenance Review Board, MRB report, maintenance planning document, effectivity
  - Objective: Trace a programme task to its controlling source and explain how the analysis, board review and planning document produced the task list.
3. Mandatory maintenance and the limits on changing it
  - Keywords: airworthiness limitations, life-limited parts, certification maintenance requirements, critical design configuration control limitations, airworthiness directives, mandatory status
  - Objective: Classify each mandatory item, identify who can approve a change and flag the item in the programme and planning records.
4. Task types, inspection levels and intervals
  - Keywords: inspection level, functional check, threshold, repeat interval, datum, out-of-phase, sampling
  - Objective: Write a maintenance task row that preserves the approved method, inspection level, threshold, repeat interval, units and starting point.
5. Building the programme basis: source register, effectivity and task-by-task disposition
  - Keywords: source register, effectivity, task disposition, fleet baseline, MRBR, MPD, Appendix I
  - Objective: Build a source register and aircraft effectivity matrix that explain how each source task is handled in the fleet programme.
6. Adapting the programme to the operation
  - Keywords: utilisation, flight cycles, check packaging, out-of-phase tasks, corrosion, operational requirements
  - Objective: Adapt the task list and check packages to the fleet's utilisation, environment and operational requirements.
7. Structures and ageing aircraft under Part-26
  - Keywords: Part-26, damage tolerance, fatigue-critical structure, CPCP, repair evaluation guidelines, limit of validity, structural inspections
  - Objective: Determine which structural programmes apply to each aircraft and carry their tasks, thresholds and reporting rules into the programme.
8. Keep the programme matched to modifications, repairs and directives
  - Keywords: supplemental type certificate, repair ICA, modification status, repetitive AD, terminating action, CDCCL, service bulletin
  - Objective: Incorporate modification and repair instructions and repetitive airworthiness directives with the correct task, clock and aircraft effectivity.
9. Writing the aircraft maintenance programme: Appendix I point by point
  - Keywords: Appendix I, effective pages, signed commitment, utilisation, effectivity, mandatory status, compliance checklist
  - Objective: Draft and cross-check the preface and contents of a Part-M aircraft maintenance programme against Appendix I point 1.
10. Getting the programme approved: direct and indirect approval
  - Keywords: M.A.302, M.B.301, M.1(3), direct approval, indirect approval, CAME 1.2, substantiation
  - Objective: Select the approval route for a Part-M programme or amendment and prepare the submission or internal approval record.
11. Permitted variations and escalation: changing an interval once or for good
  - Keywords: permitted variation, escalation, original due point, M.A.302(e), failure effect category, repeat evidence, sampling
  - Objective: Draft a permitted-variation policy and substantiate a lasting interval increase for the applicable approval route.
12. Keeping the programme current: source revisions, amendments and temporary revisions
  - Keywords: source revision, assessment log, AD compliance time, temporary revision, task master, aircraft status, effective pages
  - Objective: Assess each task in a source revision and verify that the approved decisions reach aircraft due dates and maintenance work orders.
13. The reliability programme and the annual review
  - Keywords: M.A.301(e), M.A.302(g), M.A.302(h), small fleet, reliability alert, de-escalation, annual review
  - Objective: Determine whether a fleet needs a reliability programme and justify an aircraft maintenance programme decision using service evidence and the annual review.
14. Aircraft entering the programme: bridging, lease-in, storage and return to service
  - Keywords: AMC M.A.302, M.A.307, AMC1 M.A.905, bridging, task credit, lease-in, storage
  - Objective: Build a task-by-task bridge that justifies prior maintenance credit and identifies work due before the aircraft operates.
15. Integrated case: the inspector samples the programme
  - Keywords: AMP audit, compliance checklist, CDCCL, STC effectivity, utilisation, CMR, corrective action
  - Objective: Audit an aircraft maintenance programme sample and determine which observations require a programme amendment, a records correction or a change to a procedure.

## Final exam

- Format: 12 multiple-choice questions drawn from the course question bank, with the options shuffled each attempt.
- Time limit: 18 minutes (90 seconds per question).
- Pass mark: 75%.
- Certificate: issued automatically on passing; it records the regulatory baseline incorporated in this course revision.

## Estimated learning time

7.5 hours, calculated from this revision's content with the published formula: https://aviocourse.aero/quality-and-records#study-time. Not measured attendance or a regulatory minimum.

## Related training topics

- [Continuing airworthiness training](https://aviocourse.aero/training/continuing-airworthiness-training.md)
- [EASA Part-CAMO regulation training online](https://aviocourse.aero/training/camo-training.md)
## Related courses

- [Developing an Aircraft Maintenance Programme under Part-ML](https://aviocourse.aero/courses/AMP-DEV-ML.md): Choose, document and review a Part-ML maintenance programme. Work through EASA Form AMP entries and deviation decisions, calculate due points from programme intervals and signed maintenance records, and check what carries forward at handover.
- [Air Operations and the Basic Regulation — Regulation (EU) 2018/1139; Regulation (EU) No 965/2012 (Parts ARO, ORO, CAT, SPA, NCC, NCO, SPO and IAM)](https://aviocourse.aero/courses/BAIR.md): The European air-operations framework traced from the Basic Regulation to the binding points of Regulation (EU) No 965/2012, applied to operator, crew, dispatch and oversight decisions, including applicability exceptions and IAM.
- [Maintenance Planning for CAMO Staff](https://aviocourse.aero/courses/CAMO-PLAN.md): Plan maintenance for an EASA Part-M aircraft as a CAMO planner: calculate what is due, forecast, order the work from Part-145 and verify the records that come back.
- [EASA Part-145 Regulations Initial Training](https://aviocourse.aero/courses/PART-145-INITIAL.md): Initial knowledge training in every current Part-145 Section A requirement, its four binding appendices, the authority's Section B role and the 2025–2026 amendments that change what a maintenance organisation must do.
- [Airworthiness Regulations for Part-145 Staff and Engineers — Part-M, Part-145 and Part-CAMO](https://aviocourse.aero/courses/PART-145-STAFF.md): Role-based continuing-airworthiness decisions for Part-145 staff and engineers across Part-M, Part-145 and Part-CAMO.
- [EASA Part-66 and Part-147 Regulations Initial Training](https://aviocourse.aero/courses/PART-66-147-INITIAL.md): Part-66 licensing and Part-147 training-organisation rules taught with their numbers, worked examples and the 2025 to 2026 changes for electric aeroplanes. Includes eight EASA FAQ decision pages and a 52-question application bank.
- [EASA Part-CAMO Regulations Initial Training](https://aviocourse.aero/courses/PART-CAMO-INITIAL.md): Part-CAMO Section A point by point, the EASA Form 14 privileges, the CAME, airworthiness review staff and the review itself, Section B oversight and findings, and the Part-M, Part 21, Part-IS and occurrence-reporting rules a CAMO works with, as amended by Regulation (EU) 2026/100.
- [Airworthiness Regulations for CAMO Staff — Part-M, Part-145 and Part-CAMO](https://aviocourse.aero/courses/PART-CAMO-STAFF.md): Continuing-airworthiness decisions for CAMO staff across Part-M, Part-CAMO and the Part-145 interface, current with the 2026 airworthiness review and reporting changes.
- [Combined Airworthiness Organisation Familiarisation — Part-CAO, Regulation (EU) No 1321/2014](https://aviocourse.aero/courses/PART-CAO.md): Understand what a Part-CAO organisation may do and how: scope, exposition, people, maintenance and release, continuing-airworthiness management, airworthiness reviews, records, privileges, quality system and occurrence reporting, including the 2026-08 changes. Includes seven EASA FAQ decisions and a 59-question final-exam bank.
- [EASA Part-CAO and Part-ML Regulations Initial Training](https://aviocourse.aero/courses/PART-CAO-ML-INITIAL.md): Initial knowledge training across every current Part-CAO and Part-ML Section A rule, all binding appendices, authority interfaces and publication currency.
- [EASA Part-M Regulations Initial Training](https://aviocourse.aero/courses/PART-M-INITIAL.md): Learn Part-M as it applies from 2026-08-07: Part-M or Part-ML, M.A.201 responsibilities and the management contract, occurrence reporting, the maintenance programme, records and ADs, maintenance and component rules, release to service and pilot-owner maintenance, the rewritten airworthiness review and ARC extension, and the authority side.
- [Reduced Vertical Separation Minimum (RVSM) — Part-SPA Subpart D, Regulation (EU) No 965/2012](https://aviocourse.aero/courses/RVSM.md): RVSM knowledge and decision training for operational and technical roles, with role-specific competence and authorisation established separately by the organisation.
## Common questions

### What do you practise in the Part-M AMP development course?

You build one maintenance programme for a new turboprop fleet: the source register, mandatory items, task list, structures programme, approval submission, amendments, escalation and the annual review, point by point through M.A.302 and Appendix I to AMC M.A.302.

### What does the AMP development certificate show?

The certificate records knowledge demonstrated in the course exam. Your organisation assesses practical competence and grants any authorisation to develop or approve programmes separately.

### How long is this course?

Estimated learning time: 7.5 hours, from the published formula (reading time, practice decisions, exam time and review). Self-paced completion time varies; it is not measured attendance.

### Do I get a certificate?

Yes. After every lesson is complete, a 12-question final exam (18 minutes (90 seconds per question)) must be passed at 75%. A named, sealed certificate is then issued automatically and can be checked on the public certificate checker.
