# Developing an Aircraft Maintenance Programme under Part-ML

> Online course for CAO staff and light-aircraft owners: write, declare or approve and review a Part-ML maintenance programme with the EASA Form AMP.

- Course code: AMP-DEV-ML
- Authorised by: [Dionysios Kefalas](https://aviocourse.aero/authors/dionysis-kefalas.md)
- Price: €69.00 per seat + VAT where applicable
- Estimated learning time: 5.5 hours
- Final exam: 12 questions, 18 minutes (90 seconds per question)
- Pass mark: 75%
- HTML syllabus: https://aviocourse.aero/courses/AMP-DEV-ML
- Free lesson preview: https://aviocourse.aero/courses/AMP-DEV-ML/preview

Work through the decisions behind a Part-ML aircraft maintenance programme using fictional maintenance records and real investigation cases. Decide when a separate programme is needed, choose its basis and identify mandatory and aircraft-specific tasks. Calculate due points from the governing intervals and signed work records, document alternatives to recommended maintenance and decide which tasks a pilot-owner may release. Compare worked declared and approved EASA Form AMP entries for two aeroplanes, then apply the rules to sailplane, balloon and light-helicopter records. Practise coordinating the annual programme review with the airworthiness review and checking the records for an aeroplane that changes owner and manager.

Audience: CAO and CAMO staff who approve Part-ML maintenance programmes, airworthiness review staff, independent certifying staff, light-aircraft maintenance staff, flying-club technical officers and owners or pilot-owners who declare their own programme; the course works through the programmes of two aeroplanes on the EASA Form AMP and applies the rules to sailplane, balloon and light-helicopter records.

This online aviation training course can be bought for a team or for yourself. It records progress, ends with a timed final exam and issues a certificate after passing.

Check each course’s stated references, scope and revision. Regulatory courses identify their applicable framework. International comparison guides identify the official sources reviewed on 2026-09-11; local acceptance remains subject to your organisation’s training programme.

## Regulatory baseline incorporated

Regulation (EU) No 1321/2014, Articles 1–3 and Annex Vb (Part-ML), with selected provisions of Annexes I (Part-M), II (Part-145), III (Part-66), Vc (Part-CAMO) and Vd (Part-CAO). The course focuses on ML.1, ML.A.201–202, ML.A.301–305, ML.A.307, ML.A.503–504, ML.A.803, ML.A.901–907 and Part-ML Appendices I–IV. It uses Implementing Regulations (EU) 2023/989 for ML.A.302(c), 2025/111 for scope and the inspection programme, and 2026/100 for airworthiness reviews, occurrence reporting and related organisation provisions. Guidance includes AMC1 ML.A.302(d), AMC2 ML.A.302 (EASA Form AMP, Issue 2) and Part-ML guidance Amendments 3 and 4. Supporting provisions cover scope under Regulation (EU) 2018/1139, design data under Regulation (EU) No 748/2012, operating and equipment requirements under Regulations (EU) No 965/2012, (EU) 2018/395 and (EU) 2018/1976, and occurrence reporting under Regulation (EU) No 376/2014.

This exact baseline is recorded on the certificate issued for this course revision. Check the applicable regulation and EASA publications for material issued after this baseline.

## Syllabus

11 lessons, completed in order.

1. The Part-ML AMP: which aircraft, who is responsible, and three routes
  - Keywords: Part-ML, aircraft maintenance programme, ML.A.201, ML.A.302, owner declaration, CAO approval, management contract
  - Objective: Decide which maintenance programme rules apply to an aircraft and who declares or approves its programme when a separate document is required.
2. Sources and terms for light aircraft
  - Keywords: instructions for continued airworthiness, airworthiness limitations, time limits, TCDS, life-limited parts, TBO, AD, CS-STAN
  - Objective: Classify the source instructions for a light aircraft as mandatory, recommended or inapplicable and record the evidence for each decision.
3. Choosing the basis: the manufacturer's instructions or the minimum inspection programme
  - Keywords: ML.A.302(c)(2), programme basis, design approval holder, Part 21 Light, minimum inspection programme, bridging
  - Objective: Choose and justify an aircraft maintenance programme basis using the aircraft category, design sources and operating evidence.
4. The minimum inspection programme in detail
  - Keywords: ML.A.302(d), minimum inspection programme, tolerance, actual accomplishment, transponder test, airworthiness review certificate
  - Objective: Apply the minimum inspection programme tasks, intervals and tolerances and calculate the next inspection due from actual accomplishment.
5. Mandatory information and additional tasks: making the programme fit the aircraft
  - Keywords: ML.A.302(c)(4), ML.A.302(c)(5), repetitive ADs, CS-STAN, equipment inspections, Form AMP Appendix B
  - Objective: Add the mandatory and aircraft-specific maintenance tasks for an aeroplane by checking its installed equipment, repairs, components and operation against the selected programme basis.
6. Deviating from the manufacturer's recommendations
  - Keywords: ML.A.302(c)(3), MIP comparator, recommended TBO, on-condition maintenance, deviation record, Form AMP Appendix C
  - Objective: Decide whether a manufacturer's recommendation can be changed and document a compliant alternative for a declared or approved programme.
7. Pilot-owner maintenance in the AMP
  - Keywords: ML.A.803, ML.A.302(c)(6), Part-ML Appendix II, Part-ML Appendix III, pilot-owner, certificate of release to service
  - Objective: Record pilot-owner authorisation and decide which tasks the named person may perform and release.
8. Writing the AMP: the EASA Form AMP block by block
  - Keywords: AMC2 ML.A.302, EASA Form AMP, programme basis, appendices, owner declaration, CAO approval
  - Objective: Cross-check worked EASA Form AMP entries for a declared and an approved maintenance programme.
9. The annual review and the airworthiness review
  - Keywords: annual AMP review, airworthiness review, ARC validity, ML.A.302(c)(9), ML.A.903(i), time-controlled components
  - Objective: Complete an annual programme effectiveness review, coordinate it with the airworthiness review and record the amendments the evidence requires.
10. Sailplanes, balloons and light helicopters: what changes
  - Keywords: sailplanes, touring motor gliders, balloons, light helicopters, minimum inspection programme, service-life limits, ML.A.503
  - Objective: Choose the correct programme basis and track the category-specific inspection and component limits for a sailplane, balloon or light helicopter.
11. Changes, transfers and an integrated case
  - Keywords: AMP amendments, ownership transfer, bridging inspection, ML.A.307, Part-ML Appendix I, Part-M entry, ML.A.906
  - Objective: Audit a Part-ML programme at handover, decide what needs amendment and identify the approval and maintenance evidence needed before the new programme takes effect.

## Final exam

- Format: 12 multiple-choice questions drawn from the course question bank, with the options shuffled each attempt.
- Time limit: 18 minutes (90 seconds per question).
- Pass mark: 75%.
- Certificate: issued automatically on passing; it records the regulatory baseline incorporated in this course revision.

## Estimated learning time

5.5 hours, calculated from this revision's content with the published formula: https://aviocourse.aero/quality-and-records#study-time. Not measured attendance or a regulatory minimum.

## Related training topics

- [Continuing airworthiness training](https://aviocourse.aero/training/continuing-airworthiness-training.md)
- [Regulation (EU) No 1321/2014 — Part-CAO training](https://aviocourse.aero/training/part-cao-training.md)
## Related courses

- [Developing an Aircraft Maintenance Programme under Part-M](https://aviocourse.aero/courses/AMP-DEV-M.md): Develop and control a Part-M aircraft maintenance programme. Practise setting aircraft-specific limits, preparing an approval submission, bridging a lease-in, managing interval changes and auditing the programme and its annual review.
- [Air Operations and the Basic Regulation — Regulation (EU) 2018/1139; Regulation (EU) No 965/2012 (Parts ARO, ORO, CAT, SPA, NCC, NCO, SPO and IAM)](https://aviocourse.aero/courses/BAIR.md): The European air-operations framework traced from the Basic Regulation to the binding points of Regulation (EU) No 965/2012, applied to operator, crew, dispatch and oversight decisions, including applicability exceptions and IAM.
- [Maintenance Planning for CAMO Staff](https://aviocourse.aero/courses/CAMO-PLAN.md): Plan maintenance for an EASA Part-M aircraft as a CAMO planner: calculate what is due, forecast, order the work from Part-145 and verify the records that come back.
- [EASA Part-145 Regulations Initial Training](https://aviocourse.aero/courses/PART-145-INITIAL.md): Initial knowledge training in every current Part-145 Section A requirement, its four binding appendices, the authority's Section B role and the 2025–2026 amendments that change what a maintenance organisation must do.
- [Airworthiness Regulations for Part-145 Staff and Engineers — Part-M, Part-145 and Part-CAMO](https://aviocourse.aero/courses/PART-145-STAFF.md): Role-based continuing-airworthiness decisions for Part-145 staff and engineers across Part-M, Part-145 and Part-CAMO.
- [EASA Part-66 and Part-147 Regulations Initial Training](https://aviocourse.aero/courses/PART-66-147-INITIAL.md): Part-66 licensing and Part-147 training-organisation rules taught with their numbers, worked examples and the 2025 to 2026 changes for electric aeroplanes. Includes eight EASA FAQ decision pages and a 52-question application bank.
- [EASA Part-CAMO Regulations Initial Training](https://aviocourse.aero/courses/PART-CAMO-INITIAL.md): Part-CAMO Section A point by point, the EASA Form 14 privileges, the CAME, airworthiness review staff and the review itself, Section B oversight and findings, and the Part-M, Part 21, Part-IS and occurrence-reporting rules a CAMO works with, as amended by Regulation (EU) 2026/100.
- [Airworthiness Regulations for CAMO Staff — Part-M, Part-145 and Part-CAMO](https://aviocourse.aero/courses/PART-CAMO-STAFF.md): Continuing-airworthiness decisions for CAMO staff across Part-M, Part-CAMO and the Part-145 interface, current with the 2026 airworthiness review and reporting changes.
- [Combined Airworthiness Organisation Familiarisation — Part-CAO, Regulation (EU) No 1321/2014](https://aviocourse.aero/courses/PART-CAO.md): Understand what a Part-CAO organisation may do and how: scope, exposition, people, maintenance and release, continuing-airworthiness management, airworthiness reviews, records, privileges, quality system and occurrence reporting, including the 2026-08 changes. Includes seven EASA FAQ decisions and a 59-question final-exam bank.
- [EASA Part-CAO and Part-ML Regulations Initial Training](https://aviocourse.aero/courses/PART-CAO-ML-INITIAL.md): Initial knowledge training across every current Part-CAO and Part-ML Section A rule, all binding appendices, authority interfaces and publication currency.
- [EASA Part-M Regulations Initial Training](https://aviocourse.aero/courses/PART-M-INITIAL.md): Learn Part-M as it applies from 2026-08-07: Part-M or Part-ML, M.A.201 responsibilities and the management contract, occurrence reporting, the maintenance programme, records and ADs, maintenance and component rules, release to service and pilot-owner maintenance, the rewritten airworthiness review and ARC extension, and the authority side.
- [Reduced Vertical Separation Minimum (RVSM) — Part-SPA Subpart D, Regulation (EU) No 965/2012](https://aviocourse.aero/courses/RVSM.md): RVSM knowledge and decision training for operational and technical roles, with role-specific competence and authorisation established separately by the organisation.
## Common questions

### What do you practise in the Part-ML AMP course?

You work through the programme decisions for a club aeroplane and a privately owned aeroplane — basis, mandatory and aircraft-specific tasks, deviations, pilot-owner tasks, the EASA Form AMP and the annual review — then apply the rules to sailplane, balloon and light-helicopter records.

### What does the Part-ML AMP certificate show?

The certificate records knowledge demonstrated in the course exam. It does not grant a licence, an approval or an airworthiness review authorisation.

### How long is this course?

Estimated learning time: 5.5 hours, from the published formula (reading time, practice decisions, exam time and review). Self-paced completion time varies; it is not measured attendance.

### Do I get a certificate?

Yes. After every lesson is complete, a 12-question final exam (18 minutes (90 seconds per question)) must be passed at 75%. A named, sealed certificate is then issued automatically and can be checked on the public certificate checker.
