Australian CASR Part 145 — Maintenance Organisation Staff
Free lesson preview: Australian CASR Part 145 — Maintenance Organisation Staff
Lesson 1 of 20, exactly as learners see it. No sign-in needed; practice answers are not saved.
- 6 hours learning
- 12 questions, 18 min
- Certificate at 75 %
Lesson 1 of 20
Australian framework and course limits
Learning objective: Locate staff decisions within CASR Parts 42 and 145, the binding Part 145 MOS and advisory CASA material while preserving organisation-completion boundaries.
Australian staff need to recognise which law governs the job before choosing a maintainer or a signature. CASR Part 145 governs the AMO approval; regulation 145.015 provides for the binding Part 145 Manual of Standards (MOS). Part 42 supplies the applicable maintenance, certification, release, record and defect-reporting rules. Lesson 2 explains its application through Part 202.
At fictional Example Aero Services Ltd, used here as an Australian AMO, a planner allocates a regional turboprop wheel change. The AMO approval covers the aircraft, but the proposed certifying employee’s written authorisation does not cover that type. The planner assigns an employee with the required scope. Passing this course cannot supply the missing authorisation.
Organisation completion remains required: this course assesses knowledge. The employer must establish approval scope, current exposition and procedures, aircraft-specific or task-specific data, practical competence and company authorisation for the work.
Read the source at the right level
CASR 145.040 limits services to the approval and its conditions. Regulations 145.045(a)(i) and 145.070(1) require compliance with the exposition and the ratings, limitations and MOS permissions that apply to the job. The exposition explains how this organisation meets those duties; a task instruction gives the detailed maintenance method.
CASA acceptable means of compliance (AMC) describes a method CASA accepts for meeting a requirement. AMC recommendations should be read as recommendations; the underlying CASR and MOS duties remain mandatory. Guidance material (GM) explains intent and context. An advisory circular (AC) offers advice. None of these advisory documents changes a rule or confers approval on an employee.
Regulatory basis: what this course includes
This course teaches the sources below as amended up to the act or decision shown. Anything published after it is not part of this edition of the course.
| Source | Included up to |
|---|---|
| Civil Aviation Safety Regulations 1998 (Parts 42, 99, 145 and 202 as taught) | Compilation 103 (compilation date 2026-09-29, registered 2026-10-20) |
| Part 145 Manual of Standards | Compilation 5 (2015-03-18) |
| CASA exemptions EX11/26, EX19/26, EX40/26 and EX42/26 | the instruments as made in 2026 (in force 2026-03-01 to 2029-05-31, each for its own period) |
| Transport Safety Investigation Act 2003 and its Regulations | Compilations 10 and 2 (2024-03-20) |
| Advisory Circulars AC 145-02 and AC 145-04 | versions 1.1 (2022-11) and 2.3 (2022-12) |
| CASA maintenance fatigue guidance | the edition published 2026-04-24 |
Checked against the official texts on 2026-11-17. Before relying on a point at work, check the current compilations on the Federal Register of Legislation and CASA's current guidance.
The guidance used alongside those rules includes Part 145 AMC/GM, version 3.2, 2016-04. Each exemption has its own period:
| Instrument | Period included |
|---|---|
| EX11/26 — CAR-maintenance exposition | 2026-03-01 through 2029-02-28 |
| EX19/26 — unapproved locations | 2026-03-01 through 2029-02-28 |
| EX40/26 — specialist maintenance release | 2026-05-01 through 2029-04-30 |
| EX42/26 — DAMP arrangements | 2026-06-01 through 2029-05-31 |
Read each instrument’s conditions before using its relief. The period alone does not establish eligibility.
Using this course
The course contains 20 lessons, 60 practice decisions with feedback and a separate 12-question sampled final examination. The pass mark is 75%; the final allows 18 minutes at 90 seconds per question. Estimated learning time is calculated from reading, practice and the timed exam, as described on the Quality and records page; it is a planning estimate rather than statutory training duration.
The examples use invented job details, values and records to demonstrate decisions; they are not aircraft maintenance instructions. Figure 1.1 shows the order of the checks.
At work: Before accepting a signature, check the AMO approval, current exposition and the employee’s written authorisation for that particular aircraft and function.
A course completion entered as a new privilege
3 questions · Retry freely · Separate from your final exam
Choose an action, check its consequence and explore the alternatives. Your practice answers are not saved.
At a fictional Australian AMO, a planner sees that a technician passed this course and adds the technician to a certification roster for work starting that afternoon. The practical assessment field and written authorisation record are blank.
- Training
- Knowledge course passed
- Local controls
- Practical assessment and written authorisation absent
Compare all answers and explanations
Suspend allocation and review the approval, competence and company-authorisation records for the work — Best choice.
The hold keeps assessed knowledge separate from the AMO’s grant of authority. Planning can allocate the signature after the practical-competence record and written scope are confirmed.
Allocate the task but require a senior certifier to review the completed work — Consider the consequence.
A later review may detect an error, but it cannot give the technician the missing certification privilege. The planner must remove the allocation until the AMO authorisation process is complete.
Allocate routine certification because the course establishes the relevant regulatory knowledge — Consider the consequence.
Regulatory knowledge does not demonstrate practical performance or define a personal certification scope. The technician needs the organisation’s competence assessment and written grant before signing.
Compare all answers and explanations
Record it as practical and regulatory training; the employee already holds a relevant qualification — Consider the consequence.
A licence does not convert a knowledge assessment into evidence of practical performance. The record should be corrected to show course completion and the separate organisation checks still required.
After assessment, record knowledge tested by this syllabus and list the local completion still due — Best choice.
This entry states exactly what the assessment proves and leaves the outstanding local steps visible. The AMO can then link any later competence and authorisation evidence without overstating the course.
Record it as interim certification authority pending the authorisation-panel meeting — Consider the consequence.
A course result cannot operate as temporary certification authority. Remove the provisional status and wait for the authorised panel or other exposition process to issue a written scope.
Compare all answers and explanations
A coordination email confirming similar work without recorded error and naming the employee in an approved allocation record — Consider the consequence.
The email describes experience and roster intent but does not issue the AMO privilege. The manager should submit that information through the formal authorisation process and await the recorded decision.
A current qualification extract together with the passed course result and scheduled supervision — Consider the consequence.
The licence and course may support eligibility, while supervision may support development, but none confers the planned signature. Allocation can resume only after the organisation grants the exact certification in writing.
A current AMO authorisation that covers the exact certification after documented competence checks — Best choice.
A task-matched written authorisation shows that the AMO has completed its required eligibility and competence checks. Planning must also confirm that the grant remains current before allocation.
Sources checked 2026-11-17. CASR Compilation 103, Parts 42 and 145; Part 145 MOS C05, 145.A.70; Part 145 AMC/GM v3.2, 2016-04, introduction.
Continue with lesson 2: Where Part 145 applies
€89 per seat + VAT where applicable
Get the syllabus by email
Not ready to buy? We email you the printable syllabus, the free lesson and the course page.