Purpose, boundaries and the EASA regulatory architecture
Scope, sources and author
Regulation (EU) 2018/1139 sets the essential requirements, and Regulation (EU) No 1321/2014 turns them into the continuing-airworthiness rules. For an aircraft under Annex I (Part-M), point M.A.302 is the rule for the aircraft maintenance programme (AMP). Maintenance of each aircraft “shall be organised in accordance with an AMP” (M.A.302(a)). The AMP and every amendment are approved by the competent authority (M.A.302(b)): the authority of the State of registry or, if that State agrees beforehand, another authority listed in M.1 point 3. The AMP “shall contain details of all maintenance to be carried out, including frequency” (M.A.302(f)). AMC M.A.302 point 1 draws a useful distinction: the maintenance programme includes the scheduled tasks, the associated procedures and standard maintenance practices, while the maintenance schedule is the task list alone. Where Part-ML applies instead, ML.A.302 governs and the AMP is declared by the owner or approved by the CAMO or CAO, so determine the applicable aircraft rule before using this course’s M.A.302 focus.
Two points make reliability a legal task rather than a good habit. For complex motor-powered aircraft and aircraft used by licensed air carriers, M.A.301(e) lists “the analysis of the effectiveness of the approved AMP” among the continuing-airworthiness tasks, and AMC M.A.301(e) expects a system that analyses it “with regard to spares, established defects, malfunctions and damage” and amends the programme accordingly. For complex motor-powered aircraft whose AMP is based on maintenance steering group (MSG) logic or on condition monitoring, M.A.302(g) goes further: the AMP “shall include a reliability programme”. Lesson 4 explains when that applies.
Annex Vc (Part-CAMO) gives these tasks to the organisation. CAMO.A.315(b)(1) requires the CAMO, for every aircraft it manages, to ensure that “an aircraft maintenance programme including any applicable reliability programme” is developed and controlled. CAMO.A.300 requires the continuing airworthiness management exposition (CAME), whose initial issue the competent authority approves (CAMO.A.300(b)). In the layout of AMC1 CAMO.A.300, CAME section 1.2 covers AMP development, amendment and approval, section 1.5 the analysis of AMP effectiveness and section 1.10 reliability programmes. CAMO.A.305(g) makes the CAMO establish and control the competency of its staff, and CAMO.A.125(d)(3) with CAMO.A.205 governs the work it subcontracts (Lesson 5).
Read the levels correctly; EASA FAQ 19117 explains them. Implementing rules such as M.A.302 and CAMO.A.315 are binding. Acceptable means of compliance (AMC), such as Appendix I to AMC M.A.302 and AMC M.B.301(b), are not binding but give a recognised way of meeting a rule: using them gives a presumption of compliance. A CAMO that wants to meet the rule another way uses an alternative means of compliance, which CAMO.A.120 makes subject to the competent authority’s prior approval. Guidance material (GM) is non-binding explanatory material that helps the reader understand and apply the rules and the AMC. The status comes from the type of document, not from its verbs: an AMC paragraph that says “shall”, as Appendix I point 6.5.7.1 does (Lesson 9), is still AMC. This course says which level each point comes from. The approved AMP, reliability programme and CAME turn all of this into the organisation’s own procedures, and those govern day-to-day decisions.
In a CAMO the pieces fit together like this. For a fleet of six twin-engine jets, the manufacturer’s maintenance planning document (MPD) recommends an inspection of the air-conditioning system (ATA 21) and its interval. The approved AMP turns that into the CAMO’s own task and interval, lists the aircraft it applies to, and adds tasks for modifications the fleet has embodied. The reliability programme watches the pilot reports, removals and inspection findings for that system and reports them to the reliability meeting. The CAME says who collects the data, who reviews it, who may propose an AMP amendment and how it is approved. If the reports rise, the reliability engineer raises the question; the AMP changes only through that amendment and approval route, and until then planning keeps the approved interval.
Everyday example. The manufacturer’s service book is the starting point, but the copy stamped for your own car, with the extra checks for the tow bar you fitted, is the AMP. The notebook where you log every oil top-up and warning light is the reliability programme. The family rule on who books the garage and who pays is the CAME. Reading the notebook never rewrites the service book; it tells you when to ask whether the book still fits the way the car is used.
The fleets, aircraft, figures and records in the worked examples, practice decisions and laboratories of this course are invented for training. Case pages summarise real occurrences from the official investigation reports they cite; the lessons drawn from them and the “At work” notes are the course’s own. Boxes marked “Everyday example” are everyday comparisons placed beside an aviation example.
Worked example
A CAMO manages six twin-engine jet aircraft used for commercial air transport. Over two months the technical logs show more pilot reports of cabin-temperature control faults (ATA chapter 21) than usual, and a planner asks what can be done. The rise is an input to the effectiveness analysis required by M.A.301(e) and to the reliability programme required by M.A.302(g), and CAME sections 1.5 and 1.10 say who reviews it. Planning may bring the related inspection forward on any aircraft straight away, because doing a task earlier than the AMP requires stays within the approved programme. Changing the AMP interval itself is an amendment that needs substantiation and approval, either directly under M.A.302(b) or through the CAME’s indirect-approval procedure under M.A.302(c) (Lesson 3).
Source note
Regulation (EU) No 1321/2014: M.1 point 3; M.A.301(e); M.A.302(a), (b), (f) and (g); ML.A.302(b); CAMO.A.120; CAMO.A.300(b); CAMO.A.305(g); CAMO.A.315(b)(1). AMC M.A.301(e); AMC M.A.302 point 1; AMC1 CAMO.A.300 (CAME sections 1.2, 1.5 and 1.10).
Regulatory basis: what this course includes
This course teaches the sources below as amended up to the act or decision shown. Anything published after it is not part of this edition of the course.
| Source | Included up to |
|---|---|
| Regulation (EU) No 1321/2014 — Annex I (Part-M) and Annex Vc (Part-CAMO) | Implementing Regulation (EU) 2026/100 (applicable from 2026-08-07) |
| AMC & GM to Part-M | ED Decision 2026/005/R (Issue 2, Amendment 10; file corrected 2026-09-22) |
| AMC & GM to Part-CAMO | ED Decision 2026/005/R (Issue 1, Amendment 6) |
Checked against the official texts on 2026-11-17. Before relying on a point at work, check the current consolidated text on EUR-Lex and the AMC & GM currently published by EASA, including any later ED Decision.
Purpose, boundaries and the EASA regulatory architecture
3 questions · Retry freely · Separate from your final exam
Choose an action, check its consequence and explore the alternatives. Your practice answers are not saved.
The CAMO of six twin-engine jet aircraft used for commercial air transport sees more cabin-temperature pilot reports (ATA chapter 21) than usual, and a planner asks what can be done now.
- CAME extract
- Reliability review sits with technical services; indirect approvals are issued by a named person.
- Approved AMP
- The related inspection is at 1,200 FH; one aircraft is due in 300 FH.
Compare all answers and explanations
M.A.301(e), applied through the CAME procedure for effectiveness analysis — Best choice.
Right. M.A.301(e) requires analysis of AMP effectiveness for complex motor-powered and air-carrier aircraft, and CAMO.A.315(b)(1) puts the AMP and its reliability programme under the CAMO’s control.
M.A.302(f), because the AMP must list every task with its frequency — Consider the consequence.
M.A.302(f) is about what the AMP contains. The duty to analyse the programme’s effectiveness comes from M.A.301(e).
CAMO.A.305(g), because the staff who do the analysis have to be competent — Consider the consequence.
Competence matters, but CAMO.A.305(g) is about personnel. The analysis task itself comes from M.A.301(e) and CAMO.A.315(b)(1).
Compare all answers and explanations
No; any change to a planned date waits for an approved AMP amendment — Consider the consequence.
The AMP sets the latest time for the task. Doing it earlier is compliant and needs no amendment.
Yes, if the earlier date is also written into the AMP as the new interval — Consider the consequence.
Bringing one inspection forward is fine, but rewriting the AMP interval is an amendment that needs approval under M.A.302(b) or (c).
Yes; doing the task early stays within the approved AMP — Best choice.
Right. Early accomplishment is a sensible interim step while the trend is investigated, and it changes nothing in the approved programme.
Compare all answers and explanations
Authority to accept reliability conclusions on the CAMO’s behalf at meetings — Consider the consequence.
Acceptance authority is assigned by the CAMO under its CAME, not by a training record.
Knowledge evidence the CAMO can use when it assesses and authorises staff — Best choice.
Right. CAMO.A.305(g) makes the CAMO establish and control competency, and a course record is one input to that.
The right to issue indirect approvals of AMP amendments — Consider the consequence.
Who issues indirect approvals is set in the CAME procedure approved by the competent authority (M.A.302(c)); a course cannot grant it.
Continue with lesson 2: AMP sources, content and configuration