llms.txt

Reliability Programme Analysis & Reporting — advanced

Free lesson preview: Reliability Programme Analysis & Reporting — advanced

Reliability Programme Analysis and Reporting for CAMO Technical Personnel

Lesson 1 of 19, exactly as learners see it. No sign-in needed; practice answers are not saved.

  • 5.5 hours learning
  • 12 questions, 18 min
  • Certificate at 75 %

Lesson 1 of 19

Read the approved programme and define its objectives

Scope, sources and author

Start with the approved reliability programme, not last month’s spreadsheet. Before you calculate anything, you need to know which aircraft the programme covers, which AMP it monitors, which items it controls, what counts as an event, which standards apply, who meets to decide and how the AMP gets amended. An inherited chart that serves no stated objective is decoration, however neat it looks.

Where the obligation comes from

Regulation (EU) 2018/1139, Article 17(1)(g), is the basis for the rules on continuing airworthiness management, and Regulation (EU) No 1321/2014 contains them. Two Part-M points matter here, and they are not the same obligation. M.A.301(e) makes “the analysis of the effectiveness of the approved AMP” a continuing-airworthiness task for all complex motor-powered aircraft (CMPA) and for aircraft used by air carriers licensed under Regulation (EC) No 1008/2008. M.A.302(g) is narrower and stronger: “For complex motor-powered aircraft, when the AMP is based on maintenance steering group logic or on condition monitoring, the AMP shall include a reliability programme.” CAMO.A.315(b)(1) then requires the CAMO to ensure that the AMP, “including any applicable reliability programme”, is developed and controlled.

Below the implementing rules sit the AMC. AMC M.A.302(g) gives the purpose: to ensure that AMP tasks are effective and their periodicity adequate, which may lead to the escalation or deletion of a task as well as its de-escalation or addition. AMC M.A.302(d), paragraphs 4 and 6, and paragraph 1.1.18 of Appendix I to AMC M.A.302 and AMC M.B.301(b) treat the reliability programme as part of the AMP, so it is presented and approved with the AMP under M.A.302(b) or (c). The CAME layout in AMC1 CAMO.A.300 has separate items for the analysis of AMP effectiveness (1.5) and for reliability programmes (1.10), and CAMO.A.305(g) with AMC4 CAMO.A.305(g)(d) covers the competence of the people who do the work. Where Part-ML applies, ML.A.302 governs the AMP instead and contains no reliability-programme requirement of this kind, so determine the applicable aircraft rule before using this course’s M.A.302 method.

Appendix I is a means of compliance, not the rule itself. An organisation that wants to meet M.A.302(g) differently uses an alternative means of compliance, which CAMO.A.120(b) allows only with the competent authority’s prior approval.

Appendix I to AMC M.A.302 and AMC M.B.301(b) is the EASA acceptable means of compliance that sets out what a maintenance programme should contain. In EASA’s Easy Access Rules for Continuing Airworthiness it appears among the appendices to the AMC and GM to Part-M. Its section 6 deals with reliability programmes. This course cites its paragraphs by number, always with the words “Appendix I”, so that you can look each one up. The table lists the section 6 paragraphs the course uses.

Appendix I to AMC M.A.302 and AMC M.B.301(b), section 6: what each paragraph covers
ParagraphWhat it covers
6.1When a reliability programme should, or need not, be developed
6.2Small fleets: fewer than six aircraft of the same type
6.3Engineering judgement and appropriately qualified staff
6.4Functions contracted to a maintenance organisation; the decisions stay with the CAMO
6.5.1 and 6.5.2Objectives of the programme and the items it controls
6.5.3Terms and definitions
6.5.4Information sources and collection
6.5.5Display of information, including nil returns and the rules for setting information aside
6.5.6Examination, analysis and interpretation of the information
6.5.7Corrective actions
6.5.8Organisational responsibilities
6.5.9Information presented to the competent authority
6.5.10Evaluation and review of the programme, including its standards and alert levels
6.5.11Approval of maintenance programme amendments
6.6Pooling arrangements with other CAMOs or a manufacturer-managed programme

Applicability under Appendix I

Paragraph 6.1.1 of Appendix I to AMC M.A.302 and AMC M.B.301(b) says a reliability programme should be developed when the AMP is based on MSG-3 logic, when it includes condition-monitored components, when not all significant system components have overhaul time periods, or when the manufacturer’s MRB or MPD specifies one. A significant system is one whose failure could hazard aircraft safety. Appendix I paragraph 6.1.2 says a programme need not be developed when the AMP is based on MSG-1 or MSG-2 logic but contains only hard-time or on-condition items, when the aircraft is not complex motor-powered under Part-M, or when the AMP provides overhaul periods for all significant system components. These AMC cases sit beneath M.A.302(g), whose wording covers “maintenance steering group logic” without naming a version, so an MSG-2-based AMP should have its position agreed with the competent authority rather than assumed.

Appendix I contextDecision evidence
Reliability programme should be developed (Appendix I paragraph 6.1.1)AMP based on MSG-3 logic; condition-monitored components included; not all significant system components have overhaul time periods; or the manufacturer’s MRB or MPD specifies a reliability programme.
Reliability programme need not be developed (Appendix I paragraph 6.1.2)AMP based on MSG-1 or MSG-2 logic but containing only hard-time or on-condition items; aircraft not complex motor-powered under Part-M; or the AMP provides overhaul periods for all significant system components.
Voluntary use (Appendix I paragraph 6.1.3) and fleet size (paragraph 6.2.2)A CAMO may run a voluntary programme where it is beneficial. The requirement applies irrespective of fleet size: a required programme does not disappear merely because the fleet is small.

The distinction between M.A.301(e) and M.A.302(g) is easy to miss. A licensed air carrier that operates twin-jets on an MSG-3-based AMP needs both a reliability programme and the effectiveness analysis. If the same carrier also operates single-engine turboprops of 4,000 kg MTOM, certified for nine passengers and single-pilot operation, those aircraft are not CMPA under Article 2(u) of Regulation (EU) No 1321/2014, so M.A.302(g) does not apply to them; yet M.A.301(e) still requires the effectiveness of their AMP to be analysed, because an air carrier uses them.

AMP analysis and reliability programmes have different scopesA two-row matrix compares the same carrier’s CMPA twin-jets on an MSG-3 AMP with its fully specified non-CMPA single-engine turboprops. The M.A.301(e) column applies to both through air-carrier use. The M.A.302(g) column requires a programme for the twin-jets and does not apply to the turboprops.AMP analysis and reliability programmes have different scopesTwo specified Part-M cases used by the same licensed air carrierAircraft caseM.A.301(e)AMP effectiveness analysisM.A.302(g)Reliability programmeTwin-jetsCMPA; MSG-3-based AMPRequiredAir-carrier use appliesRequiredCMPA with MSG-3 AMPSingle-engine turboprops4,000 kg MTOM; nine passengers; certifiedsingle-pilot operationNon-CMPARequiredAir-carrier use still appliesDoes not applyAircraft is non-CMPA
Figure 1.1. Both specified air-carrier cases require AMP effectiveness analysis. Only the CMPA twin-jets on an MSG-3-based AMP require a reliability programme under M.A.302(g); voluntary and other AMC programme considerations remain in the lesson.

Objectives and coverage

Paragraph 6.5.1.1 of Appendix I to AMC M.A.302 and AMC M.B.301(b) sets the minimum objectives: to recognise the need for corrective action, to establish what corrective action is needed, and to determine the effectiveness of that action. For an MSG-3-based AMP, Appendix I paragraph 6.5.1.3 adds that the programme should monitor that all MSG-3 related tasks are effective and their periodicity adequate. Appendix I paragraph 6.5.2 asks for the controlled items to be stated, for example by ATA chapter, and for items controlled by separate programmes, such as structure, engines or the APU, to be cross-referenced. A monthly pilot-report chart covers only part of that ground.

Task familyEvidence that shows whether it worksWhere it is monitored
Systems tasks on functions the crew would noticePilot reports, technical delays, unscheduled removalsReliability indicators by ATA chapter
Tasks that find hidden failures (for example, a check of a standby function the crew does not use in normal flight)Findings from the task itself; normal operations rarely reveal these failuresTask-findings review within the reliability programme
Structural inspectionsInspection and corrosion findings, sampling resultsStructural programmes, cross-referenced under Appendix I paragraph 6.5.2
Engines and APUCondition-monitoring trends, removals, shop findingsEngine and APU monitoring programmes, cross-referenced under Appendix I paragraph 6.5.2

A quiet pilot-report chart is weak evidence about a hidden-function or structural task, which is why the coverage matrix lists the evidence for each task family.

Everyday example. A family that never complains about the smoke alarm has not shown that the alarm works. Only a test shows that, and a test that sounds the horn does not prove that the alarm would sense smoke.

Read a task back to its purpose. Take Fleet Alpha’s scheduled functional check of the automatic transfer that connects standby electrical power (ATA 24) when the normal supply fails. Its failure is not evident to the crew in normal operation, so a failed transfer stays hidden until the day the normal supply is lost as well. The manufacturer’s MSG-3 analysis identifies that hidden failure and its consequence, and the scheduled check makes the transfer operate so that a dormant failure is found on the ground. Find the applicable task and its intent in the controlled source and AMP. Then pair the check results with the actual intervals at which the checks were performed. Two failures found at scheduled checks deserve engineering review even though the ATA 24 pilot-report column is empty. Eight clean checks performed early tell you about availability at those earlier ages. They give little evidence about availability at a proposed longer interval.

Case: A dormant backup-power fault the replacement test could not detect

Date and place
2022-08-27, in the climb after departure from Aberdeen, Scotland
Aircraft
Regional twin turboprop, G-LMRC
Outcome
Several flight deck displays blanked for about three seconds and the autopilot disengaged. The aircraft returned and landed safely.
Investigation
UK AAIB, AAIB-28601 (report published 2026-03-05; included in AAIB Bulletin 3/2026, published 2026-03-12)

What happened

During the climb from Aberdeen, the co-pilot switched off the landing lights as part of the normal procedure. Several flight deck displays went blank and the autopilot disengaged. The co-pilot switched the landing lights back on, and the interruption lasted about three seconds. The crew returned to Aberdeen and landed safely. A similar failure occurred on the ground when the landing lights were switched off after the aircraft had vacated the runway.

What the investigation found

When energised, a contactor (1PA) was stuck between its contact positions, so it could not feed backup power from DC BUS 1 to the emergency electrical network. The standard test after a contactor replacement could not detect that fault. At the time, a separate test at the 2C check, every 16,000 flight hours, could. The AAIB treated the loss of that backup feed as a contributory factor. It could not establish what caused the emergency network to lose its normal supply, or what caused the possible loss of power or undervoltage on DC BUS 2.

What it teaches

A backup function can fail with no sign in normal operation, and only a test that makes it do its job will find the failure. When the coverage matrix relies on a scheduled check for a hidden function, read what that check actually exercises and when it was last done, not only whether the crew reports are quiet.

At work: Pick one automatic backup or standby function in your coverage matrix. Find the AMP task that exercises it, the failure it can reveal and the actual intervals between completed checks.

Source: UK AAIB, report AAIB-28601 on G-LMRC, published 2026-03-05.

The FAA comparison used in this course

This course uses FAA AC 120-17B (dated 2018-12-19, editorial update 2026-07-09) as supplementary FAA advisory comparison material only. It has no authority in an EASA system, where M.A.302 and the competent authority govern. Its setting is an FAA continuous airworthiness maintenance program (CAMP) under 14 CFR, authorised through operations specifications (OpSpecs) and management specifications (MSpecs): D072 authorises the CAMP, D074 a reliability programme for the entire aircraft, D075 one for the airframe, powerplant, systems or selected items, and D088 maintenance time limitations. These codes are not EASA authorities or approvals. The instructive contrast is that the AC says “there is no regulatory requirement that an operator must have or maintain a reliability program” (AC 120-17B paragraph 2.2), and that an accepted programme authorised by OpSpecs lets the operator adjust tasks and intervals without prior FAA approval, subject to later FAA evaluation (paragraph 1.1). Under Part-M, the programme is mandatory in the M.A.302(g) case, and AMP changes follow the approval routes described in Lesson 16.

Worked example

A fictional CAMO manages Fleet Alpha: 14 narrow-body twin-jets operated by a licensed air carrier on an MSG-3-based AMP derived from the MRB report. They are CMPA, so M.A.302(g) applies. The new reliability analyst builds a one-page programme map before touching the inherited workbook. It records which case of Appendix I to AMC M.A.302 and AMC M.B.301(b) applies (paragraph 6.1.1, MSG-3 logic), the three minimum objectives of Appendix I paragraph 6.5.1.1, the controlled ATA chapters, the cross-references to the structural and engine monitoring programmes, the monthly cut-off, the reliability meeting and the AMP amendment procedure in the CAME. Two inherited charts serve no objective; the analyst proposes their withdrawal through the programme’s change procedure rather than deleting them quietly.

Source note

Regulation (EU) 2018/1139, Article 17(1)(g); M.A.301(e); M.A.302(b), (c) and (g); CAMO.A.120(b); CAMO.A.315(b)(1); CAMO.A.305(g) and AMC4 CAMO.A.305(g)(d); AMC M.A.302(d) paragraphs 4 and 6; AMC M.A.302(g); Appendix I to AMC M.A.302 and AMC M.B.301(b), paragraphs 1.1.18, 6.1, 6.2.2 and 6.5.1–6.5.2; AMC1 CAMO.A.300 items 1.5 and 1.10; ML.A.302; Article 2(u) of Regulation (EU) No 1321/2014. Supplementary FAA comparison: AC 120-17B paragraphs 1.1, 2.2 and 2.2.1. Case: UK AAIB report AAIB-28601 (published 2026-03-05).

Regulatory basis: what this course includes

This course teaches the sources below as amended up to the act or decision shown. Anything published after it is not part of this edition of the course.

Each source and the amendment, edition or decision this course includes
SourceIncluded up to
Regulation (EU) No 1321/2014 — Annex I (Part-M) and Annex Vc (Part-CAMO)Implementing Regulation (EU) 2026/100 (applicable from 2026-08-07)
Regulation (EU) No 965/2012 — ORO.MLR.105 (MEL)the text applicable on 2026-11-17
AMC & GM to Part-MED Decision 2026/005/R (Issue 2, Amendment 10; file corrected 2026-09-22)
AMC & GM to Part-CAMOED Decision 2026/005/R (Issue 1, Amendment 6)
CS-MMEL and CS-GEN-MMELED Decision 2025/021/R (CS-MMEL Issue 4, CS-GEN-MMEL Issue 3)

Checked against the official texts on 2026-11-17. Before relying on a point at work, check the current consolidated text on EUR-Lex and the AMC & GM currently published by EASA, including any later ED Decision.

Mid-course quiz Ungraded practice

Read the approved programme and define its objectives

3 questions · Retry freely · Separate from your final exam

Choose an action, check its consequence and explore the alternatives. Your practice answers are not saved.

Your scenario · Fictional training example

Fleet Alpha: a licensed air carrier operates 14 narrow-body twin-jets on an MSG-3-based AMP, and the inherited reliability report states no objectives.

AMP preface
The AMP preface cites the MRB report and MSG-3 logic; engines and structure have separate monitoring programmes.
Inherited report
The inherited report charts pilot reports by ATA chapter and nothing else.
Which rule makes a reliability programme mandatory for this fleet?
Compare all answers and explanations

M.A.302(g), because the CMPA AMP is based on maintenance steering group logic — Best choice.
The implementing rule requires a reliability programme for a CMPA AMP based on MSG logic or condition monitoring.

M.A.301(e), because a licensed air carrier uses the aircraft — Consider the consequence.
M.A.301(e) requires analysis of AMP effectiveness; the reliability-programme requirement itself is M.A.302(g).

Appendix I paragraph 6.1.1, the binding rule for MSG-3 programmes — Consider the consequence.
Appendix I to AMC M.A.302 and AMC M.B.301(b) is an acceptable means of compliance: it explains how to comply with M.A.302(g) but is not itself the binding rule.

What must the objective register contain as a minimum under Appendix I paragraph 6.5.1.1?
Compare all answers and explanations

Keeping every pilot-report rate below its alert line and reporting each exceedance to the competent authority — Consider the consequence.
An alert is an investigation trigger; Appendix I paragraph 6.5.1.1 does not set a target of staying below lines.

Recognising the need for corrective action, establishing what is needed and determining its effectiveness — Best choice.
These are the three minimum objectives stated in Appendix I paragraph 6.5.1.1(a) to (c).

Monitoring dispatch reliability and justifying escalations — Consider the consequence.
Dispatch reliability may be one indicator, but it is not one of the minimum objectives.

How should the programme show that tasks on hidden functions are effective?
Compare all answers and explanations

Through the pilot-report rate of the ATA chapter that contains the tasks — Consider the consequence.
A quiet pilot-report chart says little about failures the crew cannot see.

Through the engine monitoring programme that the AMP cross-references — Consider the consequence.
That programme covers engines; it does not show whether airframe hidden-function tasks work.

Through the findings of those tasks themselves — Best choice.
Hidden failures rarely appear in pilot reports, so the task findings are the evidence; Appendix I paragraph 6.5.1.3 asks for all MSG-3 tasks to be monitored.

Continue with lesson 2: Set the report plan, scope and cut-off

€119 per seat + VAT where applicable

Get the syllabus by email

Not ready to buy? We email you the printable syllabus, the free lesson and the course page.

Continue?

Help & feedback

Get guidancePrepared answers about buying, learning and certificates.

For questions about lesson content, open Ask Metis inside that lesson.

Submitted feedback is stored. If you request a reply, your reply email is stored.