llms.txt

EMAR 145 — Maintenance organisation familiarisation

Free lesson preview: EMAR 145 — Maintenance organisation familiarisation

Maintenance Organisation Familiarisation — EMAR 145

Lesson 1 of 21, exactly as learners see it. No sign-in needed; practice answers are not saved.

  • 5.5 hours learning
  • 12 questions, 18 min
  • Certificate at 75 %

Lesson 1 of 21

Framework, scope, application and approval

Welcome and scope. The European Defence Agency (EDA) Military Airworthiness Authorities (MAWA) Forum publishes harmonised European Military Airworthiness Requirements (EMARs). EDA MAWA EMAR documents are not directly applicable regulations. The National Military Airworthiness Authority is abbreviated to NMAA. National military airworthiness regulation and the NMAA determine applicable requirements, duties, privileges and procedures.

Requirement text uses shall. An Acceptable Means of Compliance (AMC) describes a non-exclusive way of meeting it, normally using should; an alternative needs prior NMAA approval under 145.A.120(b). Guidance Material (GM) explains the requirement and is not an alternative means of compliance. Competence is not established by this course, and authorisation is not conferred by course completion. Local training, assessment, licence and appointment requirements remain separate. Estimated learning time is a planning estimate, not a regulatory minimum or measured attendance.

Section A concerns the maintenance organisation; lessons 19–20 present the Section B — NMAA perspective. Lesson 21 compares national implementations of EMAR 145 and their cross-border recognition limits.

Maintenance scenarios are fictional training examples using generic aircraft and components unless an official source is expressly identified. Their task references and numerical values are illustrative, not maintenance instructions.

Who does what?

ActorResponsibility
NMAAApproves the organisation and oversees compliance.
Operating organisation / Continuing Airworthiness Management Organisation (CAMO)Provides the relevant continuing-airworthiness authority, information or instructions for the aircraft, according to EMAR M.A.201.
Maintenance organisationPerforms and releases ordered maintenance within its approval, using its Maintenance Organisation Exposition (MOE).

Use the NMAA’s application form and submission process for an initial certificate or an amendment: 145.A.15(a). For an initial certificate, provide two separate items under 145.A.15(b)(1)–(2):

  1. Your pre-audit results

    Show what your organisation checked against applicable EMAR M and EMAR 145 requirements, including the gaps found.

  2. Your compliance documents

    Show how your organisation will comply with the continuing-airworthiness EMARs. Link each applicable requirement to a procedure and supporting evidence.

The organisation performs the pre-audit. The NMAA then investigates and decides whether to approve it.

Regulatory basis: what this course includes

This course teaches the sources below as amended up to the act or decision shown. Anything published after it is not part of this edition of the course.

Each source and the amendment, edition or decision this course includes
SourceIncluded up to
EMAR 145Edition 2.0 (approved 2024-11-05)
AMC & GM to EMAR 145Edition 2.1 (approved 2025-05-27)
EMAR Forms DocumentEdition 1.8 (approved 2026-10-20)

Checked against the official texts on 2026-11-17. EMAR documents apply only as implemented by your national military airworthiness authority (NMAA). Before relying on a point at work, check the NMAA's implementation and the current EDA register.

Organisation ratings and a workshop proposal

ClassWhat the rating covers, within its limitations
AAircraft maintenance, divided into line, base or both; installed components under the permitted data and procedures.
BUninstalled engines and auxiliary power units (APUs), including their fitted components.
CUninstalled components other than complete engines or APUs.
D1Non-destructive testing (NDT) as a self-contained specialist rating.

These organisation classes in Appendix II(d)–(h) are different from personal licence categories. The scope in the MOE and the certificate's terms must agree: 145.A.20(a)–(b). An aircraft rating permits temporary removal of a component to improve access, under an MOE control procedure, except where removal generates maintenance outside the approval. EMAR M.A.502(b) also excludes removal requiring additional maintenance and does not permit a component Form 1 for this aircraft-rating activity.

A military transport maintenance organisation proposes standalone actuator repairs. Replacing an installed actuator fits its existing aircraft work; accepting removed actuators for workshop repair needs the appropriate component scope. An internal readiness review finds missing test equipment and shop-certifier assessments. The organisation obtains the equipment, completes assessment and submits the proposed approval terms, revised MOE scope and relevant compliance evidence. This is an amendment under 145.A.15(a); changed certificate terms require prior NMAA approval under 145.A.85(a)(1), (b), with implementation only after formal approval. The initial-certificate pre-audit duty in 145.A.15(b) is a separate provision. A conditional customer contract can describe the proposal; it cannot establish an approved maintenance privilege.

Standalone actuator repair needs its own approved scopeTwo columns contrast installed-actuator replacement under Class A aircraft scope with standalone removed-actuator repair under Class C component scope. A separate amendment sequence runs from demonstrated shop readiness through submission of terms, revised MOE and evidence to formal NMAA approval. Work begins only when scope, MOE and capability cover it.Standalone actuator repair needs its own approved scopeExisting aircraft work and a proposed component workshopClass A: aircraftClass C: componentsReplace the installed actuatorWithin the existing aircraft terms, maintenance dataand procedures.Repair the removed actuatorStandalone workshop repair needs appropriatecomponent scope and actual capability.The workshop proposal needs an amendmentDemonstrate shopreadinessObtain missing testequipment andcomplete shop-certifierassessments.Submit theamendmentProposed approvalterms, revised MOEscope and complianceevidence. 145.A.15(a)Formal NMAAapprovalRequired beforeimplementation.145.A.85(a)(1), (b)for approvalBegin only when approved scope, revised MOE and actual capability cover the work.
Figure 1.1. Replacing an installed actuator within existing aircraft scope does not extend approval to standalone workshop repair. In this example, component scope, shop readiness and formal NMAA approval must support the amendment before implementation; actual use follows national implementation.

At work: Before accepting the actuator job, compare the certificate rating, MOE scope, location and readiness evidence. Hold the job if any approval or capability is missing.

Sources checked 2026-11-17. 145.A.10; 145.A.15(a)–(b); 145.A.20; Appendix II(d)–(h); AMC2 145.A.15; 145.A.85(a)(1), (b); EMAR M.A.502(b). EMAR 145 Edition 2.0; AMC & GM Edition 2.1.

Mid-course quiz Ungraded practice

Defining a maintenance approval request

3 questions · Retry freely · Separate from your final exam

Choose an action, check its consequence and explore the alternatives. Your practice answers are not saved.

Your scenario · Fictional training example

An organisation approved for aircraft maintenance proposes adding standalone workshop repairs of removed actuators to its approval.

Work record
Proposed shop: test equipment ordered; shop-certifier assessments pending; a component-scope amendment has not yet been submitted to the NMAA.
What is the first scope decision?
Compare all answers and explanations

Place the shop tasks under the existing aircraft rating and retain the aircraft release procedure — Consider the consequence.
The existing aircraft rating does not cover standalone workshop repair. The component scope must be established through the approval amendment. 145.A.20; 145.A.85(a)(1), (b); Appendix II(d), (g).

Determine the component rating and shop capability needed before proposing the new standalone actuator repairs — Best choice.
Identify the component rating, limitations and capability needed for the amendment; this is a change to an existing certificate. 145.A.15(a); 145.A.20; Appendix II(g).

Place the shop tasks under the customer’s component approval and retain the local work cards — Consider the consequence.
The customer’s approval does not extend this organisation’s terms of approval or MOE scope. 145.A.20; 145.A.85(a)(1), (b).

What submission supports this proposed scope amendment?
Compare all answers and explanations

A customer order and demand forecast demonstrating the planned annual volume of actuator repairs — Consider the consequence.
Commercial demand does not demonstrate compliance for a scope amendment. Apply in the NMAA’s form and manner with relevant documentation. 145.A.15(a); 145.A.85(b).

Equipment purchase orders and training bookings demonstrating the planned investment in the actuator workshop — Consider the consequence.
Planned purchases and training are not a complete scope-change submission or evidence of achieved capability. 145.A.15(a); 145.A.20; 145.A.85(b).

Requested component approval terms and revised MOE scope, with evidence demonstrating compliance for the change — Best choice.
Submit the relevant change documentation before implementation. 145.A.15(a) governs amendments; 145.A.85(a)(1), (b) requires prior approval of changed certificate terms. The initial-certificate pre-audit duty in 145.A.15(b) is a separate provision.

When may the organisation perform and release the proposed component work?
Compare all answers and explanations

After formal NMAA approval, revised MOE scope and capability readiness cover the work — Best choice.
Implement the scope extension only after formal NMAA approval; the MOE and actual capability must support the work. 145.A.85(a)(1), (b); 145.A.20; 145.A.48(a).

After the approved aircraft customer accepts the shop’s competence assessment — Consider the consequence.
Customer acceptance cannot approve changed certificate terms or enlarge the MOE scope. 145.A.20; 145.A.85(a)(1), (b).

After the approved equipment supplier commissions the shop’s test equipment — Consider the consequence.
Commissioning equipment establishes one resource, not formal scope approval or complete capability. 145.A.20; 145.A.85(a)(1), (b); 145.A.48(a).

Continue with lesson 2: Facilities and working environment

€99 per seat + VAT where applicable

Get the syllabus by email

Not ready to buy? We email you the printable syllabus, the free lesson and the course page.

Continue?

Help & feedback

Get guidancePrepared answers about buying, learning and certificates.

For questions about lesson content, open Ask Metis inside that lesson.

Submitted feedback is stored. If you request a reply, your reply email is stored.