llms.txt

EWIS Groups 3 & 4 — Recurrent

Free lesson preview: EWIS Groups 3 & 4 — Recurrent

EWIS — AMC 20-22 — Target Groups 3 & 4 — Recurrent Knowledge Training

Lesson 1 of 11, exactly as learners see it. No sign-in needed; practice answers are not saved.

  • 3.5 hours learning
  • 12 questions, 18 min
  • Certificate at 75 %

Lesson 1 of 11

Event review — Electrical safety and role boundaries

Scope, sources and author

Electrical safety and role boundaries

Objective: Review electrical hazards, isolation, emergency response and coordinated power restoration.

AMC 20-22 Appendix B trace: TG4: rows 1.

Review the access incident

In this training case, a technician steadies a ladder by gripping a harness support. The bundle still looks intact. That observation cannot establish that the clamps, insulation or terminations escaped strain. Use the access platforms and supports intended for personnel; keep work lights and removed equipment off wiring too. AMC 20-21 §11(k) explains this protection during access.

Isolation and emergency response

EWIS includes wires, connections, protection and supports. Damage can interrupt a function, connect circuits unintentionally or produce heat and smoke.

Everyday example. A lamp can be switched off while it is still plugged in.

In a Part-145 hangar, a technician opens an access panel for an ATA 33 cabin-lighting task. The fitting is dark, like the switched-off lamp that is still connected. The technician checks the task card against the wiring diagram. The cabin switch sends a control signal while the fitting’s supply remains connected. The person authorised for isolation applies the specified controls and confirms the safe condition as the task requires before anyone handles the connector.

Situation in the bayRequired preparation or response
External power is disconnected, but the battery remains connected.Use the isolation task to identify every relevant supply and stored-energy precaution. Apply its isolation, warning and verification steps before handling the circuit.
Another team requests power for a functional test.The person coordinating power restoration checks all affected work, personnel clearance and the prescribed restoration steps. A request from one team cannot clear another team's isolation. Remove warnings and restore power through the agreed procedure.
A colleague appears to be receiving an electrical shock.Do not touch the person while electrical contact may continue. Raise the alarm and summon emergency assistance; arrange safe disconnection of the source. Once safe, first aid is given according to training and emergency-service instructions. Continue monitoring the person; effects may not be immediately apparent.
A protection device has tripped.Use the aircraft procedure for the circumstances; repeated resets can re-energise a fault. A reset rule from another aircraft or operating phase is not a substitute.

Before power application, confirm the task's safe configuration, affected teams' clearance and warning arrangements. If smoke, arcing, unusual heat or exposed wiring is found, protect people and initiate the prescribed response. Give the exact location, observations, timing and actions taken; a smell is useful evidence but does not identify the failed component.

Sources: AMC 20-22 Appendix C, Module A §§1 and 2; AMC 20-21 §11(k); GM1 145.A.47(d) on coordination of aircraft configuration between teams. Emergency principles: Electrical Safety First, electric-shock first aid and HSE electrical-safety guidance. These emergency principles support the aircraft and workplace emergency arrangements.

Regulatory basis: what this course includes

This course teaches the sources below as amended up to the act or decision shown. Anything published after it is not part of this edition of the course.

Each source and the amendment, edition or decision this course includes
SourceIncluded up to
AMC 20-22 (EWIS training), Target Groups 3 & 4AMC-20 Amendment 23 (ED Decision 2022/001/R) (AMC 20-22 unchanged since ED Decision 2008/007/R)

Checked against the official texts on 2026-11-17. Before relying on a point at work, check the current consolidated text on EUR-Lex and the AMC & GM currently published by EASA, including any later ED Decision.

Mid-course quiz Ungraded practice

Electrical safety and role boundaries

3 questions · Retry freely · Separate from your final exam

Choose an action, check its consequence and explore the alternatives. Your practice answers are not saved.

Your scenario · Fictional training example

Training case: An open access area contains wiring beside a service task. One cable has visible outer damage, but nobody knows whether the circuit is energised.

Included duties
TG3: electrical/avionic engineering on in-service aeroplanes; TG4: general maintenance/inspection outside wire maintenance, including LRU changes
Application
Review electrical hazards, isolation, emergency response and coordinated power restoration.
External power is disconnected but the battery is still connected. What establishes that the affected circuit is safe to handle?
Compare all answers and explanations

Complete the task’s isolation and verification steps. — Best choice.
Identify all relevant supplies and stored-energy precautions; disconnecting one source is insufficient. AMC 20-22 Appendix C, Module A §1.

Check that the removed unit’s display is extinguished. — Consider the consequence.
The display describes the load indication, not isolation of the circuit. AMC 20-22 Appendix C, Module A §1.

Check that the external-power connector is stowed. — Consider the consequence.
That establishes one source condition; the connected battery remains relevant. AMC 20-22 Appendix C, Module A §1.

Another team requests aircraft power while this task remains open. What should happen first?
Compare all answers and explanations

Restore the supply and notify the other teams afterwards. — Consider the consequence.
Notification after restoration cannot protect people still working under isolation. GM1 145.A.47(d); AMC 20-22 Appendix C, Module A §1.

Remove this team’s warnings when the requesting team is ready. — Consider the consequence.
Another team’s readiness does not establish this task’s safe configuration. GM1 145.A.47(d); AMC 20-22 Appendix C, Module A §1.

Coordinate clearance of the affected work before restoration. — Best choice.
The power coordinator needs the state of all affected work and personnel, not just the requesting task. GM1 145.A.47(d); AMC 20-22 Appendix C, Module A §1.

A colleague may still be in contact with an electrical source. Which response protects the rescuer?
Compare all answers and explanations

Test the cable by touch before disconnecting its supply. — Consider the consequence.
Touch is not a safe way to establish the circuit condition. AMC 20-22 Appendix C, Module A §1; electric-shock guidance linked in Lesson 1.

Keep clear, raise the alarm and arrange safe disconnection. — Best choice.
Do not touch the casualty while electrical contact may continue. Summon emergency assistance and provide first aid once safe. AMC 20-22 Appendix C, Module A §1; electric-shock guidance linked in Lesson 1.

Pull the colleague clear before calling for assistance. — Consider the consequence.
Direct contact can expose the rescuer to the same electrical source. AMC 20-22 Appendix C, Module A §1; electric-shock guidance linked in Lesson 1.

Continue with lesson 2: Event review — LRU replacement without collateral wiring damage

€55 per seat + VAT where applicable

Get the syllabus by email

Not ready to buy? We email you the printable syllabus, the free lesson and the course page.

Continue?

Help & feedback

Get guidancePrepared answers about buying, learning and certificates.

For questions about lesson content, open Ask Metis inside that lesson.

Submitted feedback is stored. If you request a reply, your reply email is stored.