Free lesson preview: EWIS Group 4 — Initial
EWIS — AMC 20-22 — Target Group 4 — Initial Knowledge Training
Lesson 1 of 7, exactly as learners see it. No sign-in needed; practice answers are not saved.
- 2.5 hours learning
- 12 questions, 18 min
- Certificate at 75 %
Lesson 1 of 7
Electrical safety and role boundaries
Learning objective: Recognise an electrical hazard, explain safe access and coordinate the response.
Electrical Wiring Interconnection System (EWIS) includes wires carrying power, data and signals and their associated connections, bonding devices, identification, protection and supports. A connector joins circuits; its contacts make the electrical connections. A backshell is the rear connector accessory that can provide cable support or shielding connections. Strain relief prevents cable loads being carried directly by terminations. A raceway supports or contains wiring along its installed path. These features matter even during a mechanical task (CS 25.1701(a)/(b)).
Within the framework of Regulation (EU) 2018/1139, Regulation (EU) 1321/2014 Annex II, 145.A.30(e), requires a Part-145 organisation to establish and control personnel competence. AMC means acceptable means of compliance: AMC5 145.A.30(e)(a)/(b) says the organisation should assess particular training needs and points to AMC 20-22 for EWIS guidance. AMC 20-22 section 2 states that TG3–TG8 have no direct regulatory EWIS-training requirement. The organisation's duty and training-needs assessment still apply; the TG4 label does not create a universal statutory course requirement. AMC describes a compliance method; GM explains a rule and is not an alternative means of compliance.
Hazard boundary and safe access
A damaged conductor can give an electric shock, create an arc or ignite nearby material. An inactive load does not prove its supply is isolated.
Everyday example. A household lamp is dark because its bulb has failed. The wiring can still be live.
During a transport jet hydraulic pump removal, a Part-145 mechanic sees a split in the outer covering of a bundle at the edge of the pump tray. Like the dark lamp, the idle pump gives no proof that its own supply is isolated. The removal card records isolation of the pump supply only. The nearby heater has a separate feed, so its circuit remains unverified. The mechanic keeps clear, stops work that could disturb the bundle and reports the exact location and any observed heat, smoke or arcing. Leave the harness undisturbed until competent personnel have assessed the damage and established safe conditions for the next task. Aircraft tasks can involve several feeds and stored energy.
- Identify the aircraft, task, affected equipment and all supplies and other energy sources addressed by the task. Read its warnings before access.
- Have competent personnel apply the prescribed isolation, stored-energy precautions and verification. Use the specified locks, tags or warning notices to control unintended re-energisation. A warning label communicates the restriction; it does not itself remove electrical energy.
- Coordinate with people working elsewhere on the aircraft. Before a powered test, establish that their work permits power application, clear the affected areas and use the required warnings and communications. Control access during the test.
- Before restoration, account for people, tools and temporary controls and follow the task's power-restoration sequence. Record any incomplete work and retained isolations for the next shift.
If someone appears to be receiving an electric shock, raise the alarm and summon emergency assistance immediately. Avoid touching the casualty or conductive surroundings while contact with the supply may continue. Use the site's emergency arrangements for safe isolation by competent personnel and trained first-aid response once safe. Do not become a second casualty by improvising a rescue on live wiring. This is emergency awareness, not first-aid training (AMC 20-22 Appendix C A.1; HSE electrical safety FAQs and NHS inform, Electric shock first aid).
Never use a wire bundle as a handhold, step or equipment support: loading can damage insulation, supports and terminations (AMC 20-21 section 11(k)). A tripped protective device and a burning odour need the aircraft's event-specific response. Re-energisation can feed a fault; a remembered reset rule from another aircraft is unsuitable (AMC 20-22 Appendix C A.1).
Power requested during open work
A ground team requests power for a navigation test while another mechanic is still reconnecting equipment in the bay. The work board shows that the bay task remains open.
- Decision
- The test leader holds power application, contacts the bay team and establishes the required safe configuration and warnings before testing.
- Reasoning
- The requested test and the open work affect the same aircraft. Coordination prevents someone re-energising equipment during another person's task. The test record and handover identify the resulting power and work status.
Syllabus map
AMC 20-22 Appendix B assigns the following objectives to TG4. The numbers identify objectives in the Appendix A/B matrix; Appendix C expands the teaching detail. The wording below is an original summary. “Knowledge” describes this online course’s teaching level; it does not attest to a manual-use demonstration or practical task competence. The electrical bonding objective retains the source’s bonding-only qualification.
| Source row and objective | Lesson and teaching heading | Level |
|---|---|---|
| 1. Recognise electrical hazards and apply authorised safe-work boundaries. | Lesson 1: Electrical safety and role boundaries — Hazard boundary and safe access | knowledge |
| 2. Recognise ESDS equipment and use its specified handling protection. | Lesson 2: LRU replacement without collateral wiring damage — ESDS recognition and handling sequence | knowledge |
| 7. Control LRU removal, retention, support, refitting and required checks. | Lesson 2: LRU replacement without collateral wiring damage — Supported LRU removal and reinstallation | knowledge |
| 13. Distinguish inspection types, required conditions and task completion. | Lesson 3: Inspection scope, visibility and escalation — Inspection conditions and coverage record | knowledge |
| 16. Recognise wiring damage and preserve a factual assessment handover. | Lesson 5: Recognising wiring damage during other work — Defect recognition during adjacent work | knowledge |
| 17. Identify external contamination entry and migration routes. | Lesson 4: Protection and contamination during maintenance — Contamination sources and migration paths | knowledge |
| 18. Identify internal fluid, debris and residue exposure. | Lesson 4: Protection and contamination during maintenance — Contamination sources and migration paths | knowledge |
| 19. Identify work-introduced and other contamination hazards. | Lesson 4: Protection and contamination during maintenance — Contamination sources and migration paths | knowledge |
| 20. Prepare task protection before the contaminating activity. | Lesson 4: Protection and contamination during maintenance — Protection, cleaning and final examination | knowledge |
| 21. Keep wiring protected during maintenance and repair. | Lesson 4: Protection and contamination during maintenance — Protection, cleaning and final examination | knowledge |
| 22. Follow permitted cleaning and examination of the affected extent. | Lesson 4: Protection and contamination during maintenance — Protection, cleaning and final examination | knowledge |
| 27. Relate typical damage to the actual aircraft area and recent work. | Lesson 5: Recognising wiring damage during other work — Defect recognition during adjacent work | knowledge |
| 31. Restore and verify disturbed bonding only, within the assigned task. | Lesson 6: Bonding restoration and closeout — Bonding evidence before closure | knowledge |
Mapping reviewed 2026-10-19 against AMC 20-22 Appendices B/C, Amendment 4, ED Decision 2008/007/R, in the Amendment 23 AMC-20 consolidation published 2023-06-23.
Regulatory basis: what this course includes
This course teaches the sources below as amended up to the act or decision shown. Anything published after it is not part of this edition of the course.
| Source | Included up to |
|---|---|
| AMC 20-22 (EWIS training), Target Group 4 | AMC-20 Amendment 23 (ED Decision 2022/001/R) (AMC 20-22 unchanged since ED Decision 2008/007/R) |
Checked against the official texts on 2026-11-17. Before relying on a point at work, check the current consolidated text on EUR-Lex and the AMC & GM currently published by EASA, including any later ED Decision.
Application: Electrical safety and role boundaries
3 questions · Retry freely · Separate from your final exam
Choose an action, check its consequence and explore the alternatives. Your practice answers are not saved.
An open access area contains wiring beside a service task. One cable has visible outer damage, but nobody knows whether the circuit is energised.
- Task status
- The damaged cable supply has not been identified; no safe-isolation confirmation is available.
Compare all answers and explanations
Keep clear while the responsible team establishes the prescribed safe condition. — Best choice.
Unknown energisation needs the task-prescribed safe condition before handling; an inactive load is insufficient. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
Move the cable using insulating gloves while the team identifies its supply. — Consider the consequence.
Gloves selected informally do not establish safe handling of an unidentified damaged circuit. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
Clear the cable after the team switches off the nearby illuminated equipment. — Consider the consequence.
Switching off a nearby load does not identify or isolate every relevant supply. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
Compare all answers and explanations
Its suitability depends on distributing the load across several secure clamps. — Consider the consequence.
Multiple clamps do not make wiring an access support. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
Its suitability depends on passing an equipment test after access is complete. — Consider the consequence.
A functional check cannot establish the absence of mechanical damage from body loading. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
Personnel loads can damage its insulation, supports and electrical connections. — Best choice.
Use the intended platform or access support; wiring is not installed to support a person. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
Compare all answers and explanations
The reset sequence used on the same equipment family during previous maintenance. — Consider the consequence.
Similar equipment can have different aircraft and event-specific restrictions. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
The reset instructions for this aircraft and the circumstances of the event. — Best choice.
Re-energisation can feed the fault; use the applicable aircraft and event procedure. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
The reset sequence selected from the device rating and the connected load. — Consider the consequence.
The rating and load do not establish whether a reset is permitted after this event. Source: AMC 20-22 Appendix C A.1; AMC 20-21 section 11(k).
Continue with lesson 2: LRU replacement without collateral wiring damage
€55 per seat + VAT where applicable
Get the syllabus by email
Not ready to buy? We email you the printable syllabus, the free lesson and the course page.