Indian CAR-145 framework and course boundary
Learning objective: Distinguish staff knowledge of Indian CAR-145 from DGCA approval, practical competence and company authorisation.
This course develops knowledge for staff working under Indian DGCA CAR-145. Passing its 12-question final examination at 75% records sampled knowledge. Organisation completion remains required. Your employer must check approval scope, current exposition and procedures, task-specific data, practical competence and company authorisation for your duties. A course certificate is not an organisation approval, maintenance licence or permission to release an aircraft.
Start with the Indian requirements
The foreword to CAR-145 identifies Rule 133B of the Aircraft Rules, 1937 as the requirement for approval of aircraft and component maintenance organisations, and Rule 133A as the power under which this CAR is issued. CAR-145 then sets the organisation's obligations; its approval and maintenance organisation exposition (MOE) identify the work it may undertake and how it controls that work.
Point 145.A.05 says Issue 3 became effective on 2025-01-01 and organisations holding Issue 2 approvals had to demonstrate compliance by 2026-07-31. Apply the Indian text to the DGCA approval. A later amendment in another jurisdiction does not change that approval or its agreed procedures.
Read the requirement and its supporting material
A CAR requirement uses mandatory language such as “shall”. An acceptable means of compliance (AMC) describes a way compliance should be demonstrated. Guidance material (GM) explains concepts and examples; it is not an alternative means of compliance. Staff follow the organisation's applicable MOE procedures, including an AMC method adopted there. Use the change process in 145.A.85 before changing a DGCA-agreed procedure. Staff cannot choose a replacement method themselves.
Figure 1.1 shows where the practical decision sits. Other Indian CARs interact with CAR-145: CAR-66 supplies personnel licensing provisions, CAR-21 deals with design and production matters, and CAR-M or CAR-ML supplies applicable continuing-airworthiness requirements. Later lessons identify the particular cross-references for components, data, release and records.
Regulatory basis: what this course includes
This course teaches the sources below as amended up to the act or decision shown. Anything published after it is not part of this edition of the course.
| Source | Included up to |
|---|---|
| DGCA CAR-145, with its integrated AMC & GM | Issue 3, Revision 2 (2026-11) |
| CAR Section 5, Series C, Part I (occurrence reporting) | Issue II, Revision 5 (2022-06-10) |
| Aeronautical Advisory Circular AAC 2 of 2024 | the edition of 2024-11-28 |
Checked against the official texts on 2026-11-17. Before relying on a point at work, check the current CAR and AAC editions on the DGCA website.
A course result on tomorrow's roster
At fictional Example Aero Services Ltd, a B1 licence holder passes this course before joining the regional-turboprop line team. The training coordinator files the result. The proposed wheel-change duties still need the employer's competence assessment and scoped company authorisation. The coordinator records: “Course passed; wheel-change practical assessment OPEN; company release authorisation NOT ISSUED.” The person is not allocated release signatures.
The 20 lessons contain 60 practice decisions and a separate 48-question final bank. The displayed learning time is a planning estimate calculated from the reading, practice and timed examination, not a DGCA attendance credit. Work through the examples before attempting the practice; compare the feedback with the cited requirement when your answer differs.
At work: Before adding anyone to a release roster, check the role assessment, relevant maintenance experience and scoped company authorisation.
Sources checked 2026-11-17. Source: DGCA, Civil Aviation Requirements, CAR-145 — Approval of Maintenance Organisations, Issue 3, Revision 2, 2026-11: foreword; 145.A.05/.10; 145.A.20, 145.A.30(e), 145.A.35(f)–(h), 145.A.70/.85.
A course result appears on a release roster
3 questions · Retry freely · Separate from your final exam
Choose an action, check its consequence and explore the alternatives. Your practice answers are not saved.
At fictional Example Aero Services Ltd, a B1 licence holder joins the regional-turboprop line team after passing this course. The records coordinator adds the person to the wheel-change release roster. MOE induction, practical assessment and company authorisation remain open.
- Learning record
- Knowledge assessment passed
- Organisation file
- Induction, practical evidence and authorisation absent
Compare all answers and explanations
The result demonstrates course knowledge within the limits of the questions sampled — Best choice.
The result accurately describes a knowledge sample and leaves practical performance outside its evidence.
It records practical competence for routine tasks performed with supervision — Consider the consequence.
Supervision may support later development, but no representative task performance was observed in this course.
It records interim authority for signatures reviewed by a certifier — Consider the consequence.
A later review cannot turn learning evidence into a temporary certification privilege.
Compare all answers and explanations
Keep the certifier allocation while a controlled MOE review checks every associated task record — Consider the consequence.
Record review may detect defects, yet it cannot supply the missing personal release authority.
When authorisation is absent, remove the release allocation and assign work under the supervision procedure — Best choice.
The revised allocation respects current evidence while allowing controlled practical development.
Limit signatures to familiar work until the company panel records its decision — Consider the consequence.
Familiarity does not create a smaller temporary release authority; the written grant must exist first.
Compare all answers and explanations
A relevant licence, the course pass and an allocation entry filed in the MOE procedure — Consider the consequence.
Licence and learning contribute evidence, but the organisation has not issued the required scope.
A manager’s email allocating the duty and an authorised colleague’s countersignature — Consider the consequence.
Neither scheduling intent nor another signature transfers authority to the learner.
A current company authorisation for the certifier, covering these signatures after competence assessment — Best choice.
The authorisation covers the planned signature after the organisation has assessed competence and eligibility.
Continue with lesson 2: Approval scope, terms of approval and privileges
€59 per seat + VAT where applicable
Get the syllabus by email
Not ready to buy? We email you the printable syllabus, the free lesson and the course page.