# EASA Part-21 and Part-26 Regulations Initial Training

> Part-21 and Part-26 regulations initial training, including every current requirement, the 2026 amendment package, final exam and certificate.

- Course code: P21
- Authorised by: [Dionysios Kefalas](https://aviocourse.aero/authors/dionysis-kefalas.md)
- Price: €85.00 per seat + VAT where applicable
- Estimated learning time: 7.5 hours
- Final exam: 12 questions, 18 minutes (90 seconds per question)
- Pass mark: 75%
- HTML syllabus: https://aviocourse.aero/courses/P21
- Free lesson preview: https://aviocourse.aero/courses/P21/preview

Initial training on EU initial airworthiness: how Part-21 (Annex I to Regulation (EU) No 748/2012) approves type designs, changes, repairs, production, airworthiness and noise certificates, parts, ETSO articles and permits to fly, and what Part-26 (Annex I to Regulation (EU) 2015/640) adds for aeroplanes and helicopters already in service. It covers the 2026 amendments to certificates of airworthiness (Regulations (EU) 2026/56 and 2026/100), the competent-authority procedures in Section B and the hand-over into continuing airworthiness under Regulation (EU) No 1321/2014. The 18 lessons use aviation examples, 54 practice decisions, eleven EASA FAQ pages and practical checks for work. Rule indices provide a point-by-point reference. The estimated learning time shown for this course is calculated from its lessons, practice decisions and timed final exam using the method on the Quality and records page. The course includes a final examination of 12 questions drawn from a 52-question bank, lasting 18 minutes (90 seconds per question), followed by review. Completion does not grant design, production, maintenance, certification or operational privileges; those come only from an approval and the holder's own authorisation of staff.

Audience: Design and production organisation personnel, certification or airworthiness engineers, quality/compliance staff and technical personnel working with aircraft, product, part or appliance approval evidence. This Part-21 and Part-26 initial regulation course does not grant design, production or certification privileges.

This online aviation training course can be bought for a team or for yourself. It records progress, ends with a timed final exam and issues a certificate after passing.

Check each course’s stated references, scope and revision. Regulatory courses identify their applicable framework. International comparison guides identify the official sources reviewed on 2026-09-11; local acceptance remains subject to your organisation’s training programme.

## Regulatory baseline incorporated

Regulation (EU) No 748/2012 — Annex I (Part-21) up to Delegated Regulation (EU) 2026/56 and Implementing Regulation (EU) 2026/100 (applicable from 2026-08-07); Regulation (EU) 2015/640 — Annex I (Part-26) up to Implementing Regulation (EU) 2024/2954 (applicable from 2024-12-22, some points later); AMC & GM to Part-21 up to ED Decision 2026/005/R (Issue 2, Amendment 18); CS-26 and its GM up to ED Decision 2024/010/R (Issue 5; file corrected 2026-06-17). Regulatory basis checked 2026-11-22.

This exact baseline is recorded on the certificate issued for this course revision. Check the applicable regulation and EASA publications for material issued after this baseline.

## Syllabus

18 lessons, completed in order.

1. How Part-21 and Part-26 rules are published and read
  - Keywords: Part-21, Part-26, implementing rules, AMC, GM, certification specifications, Easy Access Rules, Official Journal, EASA FAQ
  - Objective: Tell an implementing rule from AMC, GM, certification specifications and FAQs, and check that a rule source is current before relying on it.
2. The cover Regulations and the 2026 amendments
  - Keywords: Regulation (EU) No 748/2012 Articles, Regulation (EU) 2015/640 Articles, Part 21 Light, ELA1, ELA2, Regulation (EU) 2026/56, Regulation (EU) 2026/100, Regulation (EU) 2024/2954, ED Decision 2026/005/R, application date
  - Objective: Explain what the Articles of Regulations 748/2012 and 2015/640 decide and apply the publication, entry-into-force and application dates of the 2024 and 2026 amendments.
3. Type certification and the general duties of design holders
  - Keywords: type-certificate, type design, certification basis, 21.A.15 application validity, flight tests, 21.A.3A occurrence reporting, 72 hours, airworthiness directives, record-keeping, instructions for continued airworthiness
  - Objective: Trace a product from type-certificate application and certification basis to the type-certificate holder's continuing duties.
4. Changes to a type-certificate and supplemental type-certificates
  - Keywords: minor change, major change, GM 21.A.91, significant change, 21.A.101, supplemental type-certificate, standard change, CS-STAN, stand-alone ICA change, 21.A.90C
  - Objective: Classify a change as minor or major, choose the Subpart D or Subpart E approval path and identify the certification basis for a major change.
5. Production without a POA: Subpart F
  - Keywords: Subpart F, letter of agreement, EASA Form 65, production inspection system, statement of conformity, EASA Form 52, EASA Form 1, validation by countersignature
  - Objective: Explain how a manufacturer without a production organisation approval shows conformity under a letter of agreement.
6. Production organisation approval: Subpart G
  - Keywords: production organisation approval, POA, production management system, safety management, quality management, design-production coordination, AMC 21.A.4, privileges, EASA Form 1, EASA Form 52, EASA Form 53, findings
  - Objective: Map POA eligibility, the production management system, privileges and holder obligations.
7. Certificates of airworthiness and noise certificates after 2026-08
  - Keywords: certificate of airworthiness, restricted certificate of airworthiness, 21.A.174, evaluation programme, airworthiness review certificate, transfer between Member States, import, noise certificate, Regulation (EU) 2026/56, Regulation (EU) 2026/100
  - Objective: Assemble the application file for a certificate of airworthiness for a new aircraft, a transfer between Member States and an import, as amended from 2026-08-07.
8. Design organisation approval: Subpart J
  - Keywords: design organisation approval, DOA, design management system, design assurance, airworthiness function, independent verification, independent monitoring, head of the design organisation, privileges, information security, level 1 finding
  - Objective: Recognise the design management system, the people a DOA must appoint, its privileges and how the authority grades findings.
9. Parts, appliances, CMU components and identification
  - Keywords: 21.A.307 eligibility for installation, EASA Form 1, standard parts, manufacturer conformity document, 145.A.42, M.A.501, EPA marking, critical parts, raw material, FAQ 19007, FAQ 19010
  - Objective: Decide whether a part or appliance is eligible for installation under 21.A.307 and how the maintenance organisation accepts it.
10. Repairs, ETSO authorisations and permits to fly
  - Keywords: repair design, standard repairs, major repair, minor repair, unrepaired damage, ETSO authorisation, declaration of design and performance, permit to fly, flight conditions, EASA Form 20a, EASA Form 20b
  - Objective: Choose the approval path for a repair, an ETSO article and a flight under a permit to fly.
11. Part-21 Appendices I to VI: Form 1, permits and airworthiness certificates
  - Keywords: EASA Form 1, block 11, block 13a, approved design data, non-approved design data, Appendix II reserved, EASA Form 15a, EASA Form 15b, EASA Form 15c, EASA Form 20a, EASA Form 20b, EASA Form 24, EASA Form 25
  - Objective: Read an EASA Form 1 and tell the permit-to-fly and airworthiness-certificate forms apart, including the status of Appendix II after 2026-08.
12. Part-21 Appendices VII to XII: noise, conformity, production and flight test
  - Keywords: EASA Form 45, EASA Form 52, EASA Form 53, EASA Form 55, EASA Form 65, Appendix XII, flight-test categories, competence levels, lead flight test engineer
  - Objective: Match the noise, conformity, release, approval and letter-of-agreement forms to their issuers and use the Appendix XII flight-test categories.
13. Part-26 general provisions and aeroplane requirements
  - Keywords: Part-26, large aeroplane, small aeroplane, cabin safety, cargo compartment fire protection, runway overrun awareness, ageing aircraft, limit of validity, CPCP, damage tolerance, 26.370 maintenance programme, FAQ 104998, FAQ 127763
  - Objective: Determine which Part-26 aeroplane points apply to an aircraft and who must comply, using the actual dates and thresholds.
14. Part-26 helicopter requirements, Appendix 1 and CS-26
  - Keywords: Part-26 helicopters, small helicopter, large helicopter, ditching, underwater emergency exits, life rafts, substantiated sea conditions, emergency flotation, fuel system crash resistance, Appendix 1, CS-26 Issue 5
  - Objective: Apply the Part-26 helicopter points, including ditching equipment and the 26.440 fuel-system dates, and use Appendix 1 and CS-26 correctly.
15. Part-21 Section B: what the competent authority does
  - Keywords: Section B, competent authority, 21.1, level of involvement, type-certification basis, findings, level 1, level 2, suspension, certificate of airworthiness investigation, permit to fly issue
  - Objective: Identify the competent authority for each Part-21 subpart and the authority decisions that follow an applicant's submission.
16. From Part-21 and Part-26 into continuing airworthiness
  - Keywords: continuing airworthiness, maintenance programme, M.A.302, instructions for continued airworthiness, maintenance data, M.A.401, airworthiness directives, M.A.303, CAMO.A.315, component acceptance, FAQ 136688
  - Objective: Trace Part-21 and Part-26 outputs into the maintenance programme, maintenance data, AD compliance and airworthiness review under Regulation (EU) No 1321/2014.
17. Integrated case: one aircraft from type design to in-service control
  - Keywords: configuration control, type design, statement of conformity, certificate of airworthiness, supplemental type-certificate, repair, maintenance programme, audit
  - Objective: Trace one aircraft configuration through design approval, production, certification, modification and continuing airworthiness.
18. Keeping your rule set current and final assessment briefing
  - Keywords: currency check, Official Journal, EUR-Lex, Easy Access Rules cut-off, ED Decision, CS-26 Issue 5 file correction, final examination
  - Objective: Run a currency check on a Part-21 or Part-26 source pack and prepare for the twelve-question final examination.

## Final exam

- Format: 12 multiple-choice questions drawn from the course question bank, with the options shuffled each attempt.
- Time limit: 18 minutes (90 seconds per question).
- Pass mark: 75%.
- Certificate: issued automatically on passing; it records the regulatory baseline incorporated in this course revision.

## Estimated learning time

7.5 hours, calculated from this revision's content with the published formula: https://aviocourse.aero/quality-and-records#study-time. Not measured attendance or a regulatory minimum.

## Guides

- [A map of EASA continuing-airworthiness training](https://aviocourse.aero/guides/easa-continuing-airworthiness-training-map.md)
## Common questions

### Does this replace DOA or POA training?

No. It is initial regulation training; DOA and POA competence, approved procedures and privileges remain separate.

### How long is this course?

Estimated learning time: 7.5 hours, from the published formula (reading time, practice decisions, exam time and review). Self-paced completion time varies; it is not measured attendance.

### Do I get a certificate?

Yes. After every lesson is complete, a 12-question final exam (18 minutes (90 seconds per question)) must be passed at 75%. A named, sealed certificate is then issued automatically and can be checked on the public certificate checker.
