Using EASA-referenced training in a UK maintenance organisation
Shared technical knowledge can be useful across approvals. The organisation still needs to establish which rules, roles and delivery conditions apply.
By Dionysis Kefalas · Sources reviewed 2026-09-11
Start with the approval under which the work is performed
A technician can understand wiring damage and still be unfamiliar with the receiving employer’s reporting system or release procedures. Ask which approval covers the planned work, then compare the course objectives with the person’s actual responsibilities. A course completion record is one item in that assessment; it does not transfer a former employer’s authorisation.
The EASA and UK CAA publications are separate sources. Similar paragraph numbers help navigation but are not evidence that every amendment or acceptance route is identical. Keep the national reference beside the training decision and identify the organisation procedure that makes it usable at work.
A concrete fuel tank safety difference
The reviewed EASA FTS Appendix IV refers recurrent training to MOE Chapter 3.9; the reviewed UK CAA Appendix IV refers continuation training to MOE 3.4. Both address training within each two-year period, but copying the EASA chapter reference into a UK document can point staff to the wrong control. Use the actual approved exposition, not a course’s shorthand.
Detailed subject coverage is also different from complete Phase 2 delivery. Instructor access, intermediate evaluation, examination evidence and aircraft-relevant examples matter. A certificate labelled FTS does not by itself show that the organisation’s complete programme has been delivered.
Worked example: joining a dual-approved hangar
In this fictional example, Mara joins a hangar holding UK and EASA approvals. Her previous employer recorded EWIS inspection learning, but her new assignment includes connector repair. The training manager checks the intended maintenance duties, arranges the relevant practical assessment and confirms access to the correct wiring data. The old inspection record is retained as useful evidence rather than relabelled as repair competence.
For a fuel-system work package, the manager identifies the aircraft-specific limitations, the applicable approval and the local programme. Mara receives the missing local procedure training before working within the resulting authorisation. The decision records what was accepted, what was added and who established competence; a new course date alone would not explain any of those decisions.
What a useful acceptance record contains
A concise record makes the acceptance decision reproducible when staff or auditors change.
- The relevant approval, role and intended task scope.
- Course title, revision, assessment result and retained previous training evidence.
- Missing local procedures, practical demonstrations or aircraft-specific learning, with completion evidence.
- The responsible person’s competence decision and the applicable recurrent-training arrangements.
Official sources and scope
- EASA continuing-airworthiness AMC/GM
AMC 4/AMC 5 145.A.30(e) and FTS Appendix IV; ED Decision 2022/011/R.
- UK CAA fuel tank safety Appendix IV
ORS9 Decision 49; separate UK reference and MOE wording.
This guide explains training choices. Use the authority’s current publication for the rule itself.
Related courses
Prices per seat + VAT where applicable.
Related topics
Common questions
Does an EASA-referenced course become UK CAA approved?
No. Reference to an EASA syllabus describes the knowledge basis. UK acceptance depends on the applicable requirements and the organisation’s training and competence arrangements.