# FAA repair-station training: using an online course in the approved programme

> Understand FAA programme approval, advisory guidance, EWIS refreshers and the difference between training records and task competence.

An online course can contribute to a repair station’s training. It cannot replace the station’s approved programme or demonstrate every assigned task.

Author: [Dionysis Kefalas](https://aviocourse.aero/authors/dionysis-kefalas.md). Sources reviewed: 2026-09-11.

## The repair station owns the training programme

14 CFR 145.163 requires an FAA-approved initial and recurrent employee training programme that supports capability for assigned tasks. The rule also requires individual training records. The minimum two-year record-retention requirement is not a statement that every course expires after two years.

A sensible acceptance review connects each course objective with the work being assigned. A general wiring course might cover damage recognition while leaving a specific termination technique, tooling check or inspection standard to be demonstrated locally. Document the remaining instruction and assessment alongside the online result.

## Separate advisory guidance from the rule

FAA AC 120-94 provides an EWIS training model and recommends refreshers at least every two years. Its duties-based groups help distinguish direct wiring maintenance, inspection and other work near wiring. The AC is advisory; its discussion of groups 3–8 does not establish a universal mandatory course for every cleaner or crew member.

AC 120-72A is maintenance human-factors guidance. AC 120-97A concerns incorporating fuel-tank-system instructions into operator programmes. Calling a course ‘SFAR 88’ does not make it FAA approved: the applicable programme, aircraft instructions and actual training needs still determine how its content is used.

## Worked example: three different gaps

A fictional repair station takes on a wiring modification. Lee has passed a generic EWIS knowledge course; Sam has recent experience with the exact connector but has not received the station’s changed inspection procedure; Jo plans access work and has never considered debris falling onto wire bundles. A single identical refresher for all three would miss their different needs.

Lee needs the relevant practical capability established. Sam needs the changed procedure and an assessment appropriate to its consequences. Jo needs planning guidance on protection and restoration of affected wiring. The station maps each action into its approved training programme and keeps evidence of the outcome. None of these decisions follows merely from the age of a certificate.

## When a customer asks for an EASA certificate

Customer requirements can add training obligations, but a customer label cannot replace the FAA programme or create a foreign authorisation. Clarify the required syllabus, role, revision and evidence. Where work is also performed under another approval, identify that approval’s actual supplemental procedures before making a combined acceptance decision.



## Official sources

- [14 CFR 145.163 — Training requirements](https://www.ecfr.gov/current/title-14/chapter-I/subchapter-H/part-145/subpart-D/section-145.163): eCFR displayed current through 2026-09-08.
- [FAA AC 120-94 — EWIS training](https://www.faa.gov/documentLibrary/media/Advisory_Circular/AC_120-94.pdf): 2007-11-20, sections 4–7.
- [FAA AC 120-72A — Maintenance Human Factors Training](https://www.faa.gov/regulations_policies/advisory_circulars/index.cfm/go/document.information/documentid/1031066): 2017-04-11; active advisory guidance.
- [FAA AC 120-97A — Fuel tank system instructions](https://www.faa.gov/regulations_policies/advisory_circulars/index.cfm/go/document.information/documentID/1020085): 2012-05-25, including Change 1.

## Related courses

- [EWIS — AMC 20-22 — Target Groups 1 & 2 — Initial Knowledge Training](https://aviocourse.aero/courses/EWIS-TG12.md): EWIS initial knowledge and decision training supporting AMC 20-22 TG1 maintenance and TG2 inspection objectives, with worked technical exercises. Practical objectives require separate organisational assessment.
- [Fuel Tank Safety — Phase 1 & 2 (Initial Training)](https://aviocourse.aero/courses/FTS-PHASE-1-2.md): Phase 1 awareness and Phase 2 fuel-tank-safety subject learning, with document exercises and a knowledge examination, for integration into the organisation’s complete initial-training programme.
- [Human Factors in Aircraft Maintenance](https://aviocourse.aero/courses/HF-MAINT.md): Standalone aircraft-maintenance Human Factors training with 23 lessons, 69 practice decisions, a 93-question final bank and a consolidated international regulatory reference section.
- [Airworthiness Regulations for Part-145 Staff and Engineers — Part-M, Part-145 and Part-CAMO](https://aviocourse.aero/courses/PART-145-STAFF.md): Role-based continuing-airworthiness decisions for Part-145 staff and engineers across Part-M, Part-145 and Part-CAMO.
## Related topics

- [EWIS Target Groups 1–8: initial and recurrent courses](https://aviocourse.aero/training/ewis-training.md)
- [Human Factors: initial and recurrent aviation training](https://aviocourse.aero/training/human-factors-training.md)

## Common questions

### Is FAA AC 120-94 dated 1997 or 2007?

The official PDF is dated 2007-11-20. The FAA catalogue displays a conflicting 1997 metadata date; use the document date when identifying the guidance.

### Does the FAA approve this website’s courses?

No FAA approval of these standalone courses is claimed. A repair station decides how relevant learning contributes to its approved programme.
