llms.txt

Maintenance Planning for CAMO Staff

CAMO maintenance planning engineers and technical records staff, and the continuing-airworthiness, Part-145 production planning and airworthiness review staff who work with them; the course follows one aircraft from a counter snapshot to proven status after a base-maintenance visit.

  • 7.5 hours learning
  • 12 questions, 18 min
  • Certificate at 75 %
For
CAMO maintenance planning engineers and technical records staff, and the continuing-airworthiness, Part-145 production planning and airworthiness review staff who work with them; the course follows one aircraft from a counter snapshot to proven status after a base-maintenance visit.
Regulation, up to
Regulation (EU) No 1321/2014 — Annex I (Part-M), Annex II (Part-145) and Annex Vc (Part-CAMO) up to Implementing Regulation (EU) 2026/100 (applicable from 2026-08-07)
Regulation (EU) No 748/2012 — point 21.A.3B up to Delegated Regulation (EU) 2026/56 and Implementing Regulation (EU) 2026/100 (applicable from 2026-08-07)
Regulation (EU) 2015/640 — Annex I (Part-26): the ageing-aircraft points taught (26.370) up to Implementing Regulation (EU) 2024/2954 (applicable from 2024-12-22, some points later)
Regulation (EU) No 965/2012 — ORO.MLR.105 up to the text applicable on 2026-11-22 (as in the Air Operations Easy Access Rules, revision 24 (2026-03); Delegated Regulation (EU) 2026/1979, published 2026-11-13, does not change ORO.MLR.105)
Implementing Regulation (EU) 2015/1018 (occurrence lists) up to Implementing Regulation (EU) 2026/1821 (applicable from 2026-08-17)
AMC, GM & CS, up to
AMC & GM to Part-M up to ED Decision 2026/005/R (Issue 2, Amendment 10; file corrected 2026-09-22)
AMC & GM to Part-145 up to ED Decision 2026/005/R (Issue 2, Amendment 9)
AMC & GM to Part-CAMO up to ED Decision 2026/005/R (Issue 1, Amendment 6)
AMC & GM to Part-ORO (ORO.MLR.105) up to the edition applicable on 2026-11-22 (as in the Air Operations Easy Access Rules, revision 24 (2026-03))
CS-26 and its GM (CS 26.370) up to ED Decision 2024/010/R (Issue 5; file corrected 2026-06-17)
CS-MMEL up to ED Decision 2025/021/R (Issue 4)Checked against the official texts on 2026-11-22.
Time
7.5 hours estimated learning time, online and self-paced
Exam
12 questions in 18 minutes (90 seconds per question), pass mark 75 %. 3 attempts; after 3 failed attempts the learner works through the lessons again.
Record
Named certificate with an electronic seal anyone can check
Revision
0 · reviewed 2026-11-22References support the training scope; operational use requires current applicable rules and the organisation’s accepted procedures.
MAINTENANCE PLANNING M.A.301–M.A.307 · CAMO.A.315 PLAN MAINTENANCE
16 lessons to collect · yours when you pass

What this course builds

From the course’s own lessons, across nine working competences.

  1. Compliance Supporting
  2. Safety policy & reporting Not covered
  3. Risk assessment Supporting
  4. Human performance Touches on
  5. Technical practice Touches on
  6. Airworthiness & records Core
  7. Auditing & investigation Supporting
  8. Security awareness Not covered
  9. Training & assessment Not covered

Who this course is for

CAMO maintenance planning engineers and technical records staff, and the continuing-airworthiness, Part-145 production planning and airworthiness review staff who work with them; the course follows one aircraft from a counter snapshot to proven status after a base-maintenance visit.

What the learner receives

Documented knowledge training, recorded lesson progress, a final exam result, and a named certificate with an electronic seal that anyone can check on the public certificate checker. Practical competence, aircraft access and organisational authorisation remain separate.

Overview

For CAMO planning engineers and technical records staff. Work through maintenance planning for one aircraft of a fictional EU airline operating under Part-M and Part-CAMO: calculate due points and permitted variations, forecast, track life-limited parts and airworthiness directives, control deferred defects, build the work package and work order for a Part-145 base visit, then reconcile the returned records and update the aircraft's status. Real accident and enforcement cases show what happens when planning control fails.

Syllabus

16 lessons, completed in order — each with its keywords and objective.

  1. 1

    The planner's job: from requirement to proven status

    Objective: Trace a maintenance requirement from its source to the updated aircraft status and identify who is responsible at each handover.

    due listwork ordercontinuing airworthiness recordsrelease to serviceM.A.305CAMO.A.315145.A.47
  2. 2

    Building the requirement set

    Objective: Load an approved programme revision and verify that each affected aircraft has a complete set of applicable planning entries with the correct due limits.

    task mastereffectivityAMP revisionairworthiness limitationsCMRCDCCLM.A.302CAMO.A.325
  3. 3

    Reading a task: units, thresholds and "whichever first"

    Objective: Calculate the first and next due points from the governing task, its counters and its stated starting point.

    thresholdrepeat intervaldatumflight cyclescalendar limitstask typeaccomplishment evidence
  4. 4

    Next due, early work and permitted variations

    Objective: Calculate the next due point after early, on-time or varied accomplishment and document the eligibility and approval of a one-off variation.

    next dueearly accomplishmentpermitted variationnominal limitescalationM.A.302EASA FAQ 19102
  5. 5

    Utilisation and the forecast

    Objective: Build a forecast from reconciled hours, cycles and calendar limits and revise it when flying or aircraft allocation changes.

    utilisationcounter snapshotflight hoursflight cyclescalendar limitmaintenance slot
  6. 6

    Life-limited parts and time-controlled components

    Objective: Calculate component life remaining, plan a removal before the controlling limit and verify the records for a proposed installation.

    life-limited parttime-controlled componentcycle historyoverhaulstub lifeM.A.503EASA Form 1
  7. 7

    Airworthiness directives: applicability and compliance time

    Objective: Determine whether an airworthiness directive applies, calculate each compliance limit and record its status with supporting evidence.

    airworthiness directiveapplicabilityeffective daterepetitive inspectionterminating actionAMOCM.A.303
  8. 8

    Modifications, service bulletins and repairs

    Objective: Use a modification or repair decision to update the aircraft configuration, maintenance tasks and supporting records.

    service bulletinrepair approvalconfigurationeffectivityfollow-up inspectionCAMO.A.315M.A.304
  9. 9

    Defects, deferrals and the MEL

    Objective: Plan defect rectification within the applicable limits and identify when the operator can use a rectification interval extension.

    M.A.403ORO.MLR.105minimum equipment listrectification intervaldeferred defectsrepetitive defects
  10. 10

    Building the work package

    Objective: Build a visit package that covers the due window and fits the available access, labour and inspection capacity.

    work packagedue windowout-of-phase tasksinterval utilisationlabour capacitypackage index
  11. 11

    Ordering the work from Part-145

    Objective: Write a work order with enough detail for Part-145 to execute the scope and return decisions and evidence during the visit.

    CAMO.A.315contracted maintenancework orderproduction planningscope changesshift handover145.A.50
  12. 12

    Closing the package and updating the records

    Objective: Reconcile each ordered line to the returned evidence and calculate the aircraft's next due positions from the supported work.

    reconciliationcertificate of release to serviceM.A.305AD statuscomponent historynext due
  13. 13

    When the plan changes

    Objective: Revise a maintenance plan after a short-notice change and record a decision that keeps the aircraft within its applicable limits.

    short-notice ADreforecastslot lossaircraft swapmaintenance findingspermitted variationCAMO.A.315
  14. 14

    Storage, transfers and changing programmes

    Objective: Build a records and maintenance plan that preserves aircraft status through storage, fleet transfer or a change of maintenance programme.

    storagepreservationreturn to servicerecords transferAMP bridginglease handbackM.A.307
  15. 15

    Planning data, controls and human factors

    Objective: Detect and correct errors in planning records before they cause a maintenance limit to be missed.

    counter reconciliationtask masterexception reportdata integrityshift handoverprogramme reviewM.A.305
  16. 16

    Integrated case: from forecast to a defendable status

    Objective: Build a due list and reconcile a base-maintenance visit to the signed records that support dispatch, redelivery and airworthiness review.

    C-packagedue listwork orderchange logreconciliationairworthiness reviewM.A.903

Final exam

  • Format: 12 multiple-choice questions drawn from the course question bank, with the options shuffled each attempt.
  • Time limit: 18 minutes (90 seconds per question), timed from the moment you start the exam.
  • Pass mark: 75%.
  • Attempts: 3. After 3 failed attempts the learner works through the lessons again before the next attempt.
  • Certificate: issued automatically on passing; it records the regulatory baseline incorporated in this course revision.

Estimated learning time

7.5 hours

Calculated from this revision’s content with the published formula: reading time, practice decisions, exam time and a review allowance. Not measured attendance or a regulatory minimum; your own pace may differ.

Developed in consultation with aviation subject-matter experts; authorised by , aircraft maintenance engineer with 17 years in the Hellenic Air Force and 11 years in civil aviation. International scope and acceptance.

Course documents and help

Get the syllabus by email

Not ready to buy? We email you the printable syllabus, the free lesson and the course page.

Related training topics

Common questions

What do you practise in the maintenance planning course?

Follow one aircraft through a base-maintenance visit. Calculate due dates and limits, prepare the work order and check the evidence before updating the aircraft records.

What does the CAMO maintenance planning certificate show?

The certificate records knowledge demonstrated in the course exam. Your organisation assesses practical competence and grants any role authorisation separately.

How long is this course?

Estimated learning time: 7.5 hours, from the published formula (reading time, practice decisions, exam time and a review allowance). Your own pace may differ; it is not measured attendance.

Do I get a certificate?

Yes. After every lesson is complete, a 12-question final exam (18 minutes (90 seconds per question)) must be passed at 75%. A named certificate with an electronic seal is then issued automatically and can be checked on the public certificate checker.

Can I see the course before buying?

Yes. Lesson 1, with its practice questions, is free to read without signing in. Use Preview lesson 1 free beside the price.

Continue?

Help & feedback

Get guidancePrepared answers about buying, learning and certificates.

For questions about lesson content, open Ask Metis inside that lesson.

Submitted feedback is stored. If you request a reply, your reply email is stored.