llms.txt

EASA Part-21 & Part-26 — Initial

EASA Part-21 and Part-26 Regulations Initial Training

Design and production organisation personnel, certification or airworthiness engineers, quality/compliance staff and technical personnel working with aircraft, product, part or appliance approval evidence.

  • 7.5 hours learning
  • 12 questions, 18 min
  • Certificate at 75 %
For
Design and production organisation personnel, certification or airworthiness engineers, quality/compliance staff and technical personnel working with aircraft, product, part or appliance approval evidence.
Stage
Initial training
Regulation, up to
Regulation (EU) No 748/2012 — Annex I (Part-21) up to Delegated Regulation (EU) 2026/56 and Implementing Regulation (EU) 2026/100 (applicable from 2026-08-07)
Regulation (EU) 2015/640 — Annex I (Part-26) up to Implementing Regulation (EU) 2024/2954 (applicable from 2024-12-22, some points later)
AMC, GM & CS, up to
AMC & GM to Part-21 up to ED Decision 2026/005/R (Issue 2, Amendment 18)
CS-26 and its GM up to ED Decision 2024/010/R (Issue 5; file corrected 2026-06-17)Checked against the official texts on 2026-11-22.
Time
7.5 hours estimated learning time, online and self-paced
Exam
12 questions in 18 minutes (90 seconds per question), pass mark 75 %. 3 attempts; after 3 failed attempts the learner works through the lessons again.
Record
Named certificate with an electronic seal anyone can check
Revision
0 · reviewed 2026-11-22References support the training scope; operational use requires current applicable rules and the organisation’s accepted procedures.
PART-21 & PART-26 Reg. (EU) 748/2012 · 2015/640 21 PART 21 · 26
18 lessons to collect · yours when you pass

What this course builds

From the course’s own lessons, across nine working competences.

  1. Compliance Core
  2. Safety policy & reporting Touches on
  3. Risk assessment Supporting
  4. Human performance Not covered
  5. Technical practice Touches on
  6. Airworthiness & records Core
  7. Auditing & investigation Supporting
  8. Security awareness Not covered
  9. Training & assessment Touches on

Who this course is for

Design and production organisation personnel, certification or airworthiness engineers, quality/compliance staff and technical personnel working with aircraft, product, part or appliance approval evidence. This Part-21 and Part-26 initial regulation course does not grant design, production or certification privileges.

What the learner receives

Documented knowledge training, recorded lesson progress, a final exam result, and a named certificate with an electronic seal that anyone can check on the public certificate checker. Practical competence, aircraft access and organisational authorisation remain separate.

Overview

Initial training on EU initial airworthiness: how Part-21 (Annex I to Regulation (EU) No 748/2012) approves type designs, changes, repairs, production, airworthiness and noise certificates, parts, ETSO articles and permits to fly, and what Part-26 (Annex I to Regulation (EU) 2015/640) adds for aeroplanes and helicopters already in service. It covers the 2026 amendments to certificates of airworthiness (Regulations (EU) 2026/56 and 2026/100), the competent-authority procedures in Section B and the hand-over into continuing airworthiness under Regulation (EU) No 1321/2014. The 18 lessons use aviation examples, 54 practice decisions, eleven EASA FAQ pages and practical checks for work. Rule indices provide a point-by-point reference. The estimated learning time shown for this course is calculated from its lessons, practice decisions and timed final exam using the method on the Quality and records page. The course includes a final examination of 12 questions drawn from a 52-question bank, lasting 18 minutes (90 seconds per question), followed by review. Completion does not grant design, production, maintenance, certification or operational privileges; those come only from an approval and the holder's own authorisation of staff.

Syllabus

18 lessons, completed in order — each with its keywords and objective.

  1. 1

    How Part-21 and Part-26 rules are published and read

    Objective: Tell an implementing rule from AMC, GM, certification specifications and FAQs, and check that a rule source is current before relying on it.

    Part-21Part-26implementing rulesAMCGMcertification specificationsEasy Access RulesOfficial JournalEASA FAQ
  2. 2

    The cover Regulations and the 2026 amendments

    Objective: Explain what the Articles of Regulations 748/2012 and 2015/640 decide and apply the publication, entry-into-force and application dates of the 2024 and 2026 amendments.

    Regulation (EU) No 748/2012 ArticlesRegulation (EU) 2015/640 ArticlesPart 21 LightELA1ELA2Regulation (EU) 2026/56Regulation (EU) 2026/100Regulation (EU) 2024/2954ED Decision 2026/005/Rapplication date
  3. 3

    Type certification and the general duties of design holders

    Objective: Trace a product from type-certificate application and certification basis to the type-certificate holder's continuing duties.

    type-certificatetype designcertification basis21.A.15 application validityflight tests21.A.3A occurrence reporting72 hoursairworthiness directivesrecord-keepinginstructions for continued airworthiness
  4. 4

    Changes to a type-certificate and supplemental type-certificates

    Objective: Classify a change as minor or major, choose the Subpart D or Subpart E approval path and identify the certification basis for a major change.

    minor changemajor changeGM 21.A.91significant change21.A.101supplemental type-certificatestandard changeCS-STANstand-alone ICA change21.A.90C
  5. 5

    Production without a POA: Subpart F

    Objective: Explain how a manufacturer without a production organisation approval shows conformity under a letter of agreement.

    Subpart Fletter of agreementEASA Form 65production inspection systemstatement of conformityEASA Form 52EASA Form 1validation by countersignature
  6. 6

    Production organisation approval: Subpart G

    Objective: Map POA eligibility, the production management system, privileges and holder obligations.

    production organisation approvalPOAproduction management systemsafety managementquality managementdesign-production coordinationAMC 21.A.4privilegesEASA Form 1EASA Form 52EASA Form 53findings
  7. 7

    Certificates of airworthiness and noise certificates after 2026-08

    Objective: Assemble the application file for a certificate of airworthiness for a new aircraft, a transfer between Member States and an import, as amended from 2026-08-07.

    certificate of airworthinessrestricted certificate of airworthiness21.A.174evaluation programmeairworthiness review certificatetransfer between Member Statesimportnoise certificateRegulation (EU) 2026/56Regulation (EU) 2026/100
  8. 8

    Design organisation approval: Subpart J

    Objective: Recognise the design management system, the people a DOA must appoint, its privileges and how the authority grades findings.

    design organisation approvalDOAdesign management systemdesign assuranceairworthiness functionindependent verificationindependent monitoringhead of the design organisationprivilegesinformation securitylevel 1 finding
  9. 9

    Parts, appliances, CMU components and identification

    Objective: Decide whether a part or appliance is eligible for installation under 21.A.307 and how the maintenance organisation accepts it.

    21.A.307 eligibility for installationEASA Form 1standard partsmanufacturer conformity document145.A.42M.A.501EPA markingcritical partsraw materialFAQ 19007FAQ 19010
  10. 10

    Repairs, ETSO authorisations and permits to fly

    Objective: Choose the approval path for a repair, an ETSO article and a flight under a permit to fly.

    repair designstandard repairsmajor repairminor repairunrepaired damageETSO authorisationdeclaration of design and performancepermit to flyflight conditionsEASA Form 20aEASA Form 20b
  11. 11

    Part-21 Appendices I to VI: Form 1, permits and airworthiness certificates

    Objective: Read an EASA Form 1 and tell the permit-to-fly and airworthiness-certificate forms apart, including the status of Appendix II after 2026-08.

    EASA Form 1block 11block 13aapproved design datanon-approved design dataAppendix II reservedEASA Form 15aEASA Form 15bEASA Form 15cEASA Form 20aEASA Form 20bEASA Form 24EASA Form 25
  12. 12

    Part-21 Appendices VII to XII: noise, conformity, production and flight test

    Objective: Match the noise, conformity, release, approval and letter-of-agreement forms to their issuers and use the Appendix XII flight-test categories.

    EASA Form 45EASA Form 52EASA Form 53EASA Form 55EASA Form 65Appendix XIIflight-test categoriescompetence levelslead flight test engineer
  13. 13

    Part-26 general provisions and aeroplane requirements

    Objective: Determine which Part-26 aeroplane points apply to an aircraft and who must comply, using the actual dates and thresholds.

    Part-26large aeroplanesmall aeroplanecabin safetycargo compartment fire protectionrunway overrun awarenessageing aircraftlimit of validityCPCPdamage tolerance26.370 maintenance programmeFAQ 104998FAQ 127763
  14. 14

    Part-26 helicopter requirements, Appendix 1 and CS-26

    Objective: Apply the Part-26 helicopter points, including ditching equipment and the 26.440 fuel-system dates, and use Appendix 1 and CS-26 correctly.

    Part-26 helicopterssmall helicopterlarge helicopterditchingunderwater emergency exitslife raftssubstantiated sea conditionsemergency flotationfuel system crash resistanceAppendix 1CS-26 Issue 5
  15. 15

    Part-21 Section B: what the competent authority does

    Objective: Identify the competent authority for each Part-21 subpart and the authority decisions that follow an applicant's submission.

    Section Bcompetent authority21.1level of involvementtype-certification basisfindingslevel 1level 2suspensioncertificate of airworthiness investigationpermit to fly issue
  16. 16

    From Part-21 and Part-26 into continuing airworthiness

    Objective: Trace Part-21 and Part-26 outputs into the maintenance programme, maintenance data, AD compliance and airworthiness review under Regulation (EU) No 1321/2014.

    continuing airworthinessmaintenance programmeM.A.302instructions for continued airworthinessmaintenance dataM.A.401airworthiness directivesM.A.303CAMO.A.315component acceptanceFAQ 136688
  17. 17

    Integrated case: one aircraft from type design to in-service control

    Objective: Trace one aircraft configuration through design approval, production, certification, modification and continuing airworthiness.

    configuration controltype designstatement of conformitycertificate of airworthinesssupplemental type-certificaterepairmaintenance programmeaudit
  18. 18

    Keeping your rule set current and final assessment briefing

    Objective: Run a currency check on a Part-21 or Part-26 source pack and prepare for the twelve-question final examination.

    currency checkOfficial JournalEUR-LexEasy Access Rules cut-offED DecisionCS-26 Issue 5 file correctionfinal examination

Final exam

  • Format: 12 multiple-choice questions drawn from the course question bank, with the options shuffled each attempt.
  • Time limit: 18 minutes (90 seconds per question), timed from the moment you start the exam.
  • Pass mark: 75%.
  • Attempts: 3. After 3 failed attempts the learner works through the lessons again before the next attempt.
  • Certificate: issued automatically on passing; it records the regulatory baseline incorporated in this course revision.

Estimated learning time

7.5 hours

Calculated from this revision’s content with the published formula: reading time, practice decisions, exam time and a review allowance. Not measured attendance or a regulatory minimum; your own pace may differ.

Developed in consultation with aviation subject-matter experts; authorised by , aircraft maintenance engineer with 17 years in the Hellenic Air Force and 11 years in civil aviation. International scope and acceptance.

Course documents and help

Get the syllabus by email

Not ready to buy? We email you the printable syllabus, the free lesson and the course page.

Use the catalogue to compare other training by role, framework and stage.

Guides

Common questions

Does this replace DOA or POA training?

No. It is initial regulation training; DOA and POA competence, approved procedures and privileges remain separate.

Is this a DOA or POA course?

No. It is initial regulation training for people who work with Part-21 and Part-26; organisation approval, competence and individual privileges remain separate.

How long is this course?

Estimated learning time: 7.5 hours, from the published formula (reading time, practice decisions, exam time and a review allowance). Your own pace may differ; it is not measured attendance.

Do I get a certificate?

Yes. After every lesson is complete, a 12-question final exam (18 minutes (90 seconds per question)) must be passed at 75%. A named certificate with an electronic seal is then issued automatically and can be checked on the public certificate checker.

Can I see the course before buying?

Yes. Lesson 1, with its practice questions, is free to read without signing in. Use Preview lesson 1 free beside the price.

Continue?

Help & feedback

Get guidancePrepared answers about buying, learning and certificates.

For questions about lesson content, open Ask Metis inside that lesson.

Submitted feedback is stored. If you request a reply, your reply email is stored.