llms.txt

EASA Part-21 & Part-26 — Initial

Free lesson preview: EASA Part-21 & Part-26 — Initial

EASA Part-21 and Part-26 Regulations Initial Training

Lesson 1 of 18, exactly as learners see it. No sign-in needed; practice answers are not saved.

  • 7.5 hours learning
  • 12 questions, 18 min
  • Certificate at 75 %

Lesson 1 of 18

How Part-21 and Part-26 rules are published and read

This course covers two Commission Regulations. Regulation (EU) No 748/2012 contains Part-21 in Annex I: the rules for type certification, changes and repairs, production, certificates of airworthiness and noise certificates, parts, ETSO articles, permits to fly, and design and production organisations. Regulation (EU) 2015/640 contains Part-26 in Annex I: additional airworthiness specifications that operators and design approval holders must meet for aircraft whose design is already certified, such as cabin fire protection, ageing-structure programmes and helicopter ditching equipment. If you work in a design office, a production line, a CAMO, a Part-145 stores or an authority, both reach your desk.

The estimated learning time shown for this course is calculated from its lessons, practice decisions and timed final exam using the method on the Quality and records page. Each lesson starts with a working case, explains the duties that decide it, and closes with a rule index listing every current point it covers in one line, for look-up later. The indices are short navigation aids; read the full point and its conditions before making a workplace decision. The twelve-question final examination allows 18 minutes (90 seconds per question). The final draws 12 questions from a 52-question bank and requires 75%, or at least nine correct answers.

Who writes what

EASA supports rulemaking through technical work and opinions. Acting under the Basic Regulation, the European Commission adopts the applicable delegated or implementing regulation; publication in the Official Journal is its legal publication. EASA Executive Director Decisions separately adopt AMC and GM or Certification Specifications, under Article 76(3) of Regulation (EU) 2018/1139. The level a sentence comes from decides how you may use it, so the first habit of a good reviewer is to label every source by level.

The five levels you will meet in this course
LevelExampleWhat it means for you
Implementing rule (IR) in a Commission Regulation21.A.174; 26.205Binding. Where it says "shall", you comply.
Acceptable means of compliance (AMC), adopted by ED DecisionAMC 21.A.4; AMC1 21.B.320One accepted way to comply. Article 10(2) of Regulation 748/2012: AMC "shall neither introduce new requirements nor alleviate" the rule. A production organisation or Subpart F manufacturer may propose an alternative means (21.A.134A, 21.A.124A), which its competent authority must approve before use.
Guidance material (GM), adopted by ED DecisionGM 21.A.91Explains and illustrates the rule. It sets no requirement of its own.
Certification specifications (CS), adopted by ED DecisionCS-26 Issue 5Technical standards. Under 26.30(b), operators and design holders may show Part-26 compliance with CS-26 or with technical standards offering an equivalent level of safety.
EASA FAQFAQ 136688EASA's answer to a recurring question. Useful, dated and not binding.
Source status survives compilationThe European Commission adopts binding rules on the left. EASA Executive Director Decisions separately adopt AMC, GM and CS on the right. Below, Easy Access Rules are identified as an unofficial consolidation and an FAQ as dated, non-binding context.Source status survives compilationSeparate adoption paths under the Basic RegulationEuropeanCommissionAdopts Regulations;legal publication is inthe Official Journal.EASA Executive Director DecisionsSeparately adopt supporting material under Article 76(3) of Regulation (EU)2018/1139.Binding rulesApplicableimplementing rulesbind. Where the rulesays “shall”, youcomply.AMC: acceptedmeansOne accepted way tocomply. Neither addsto nor relaxes therule.GM: explanationExplains andillustrates. Sets norequirement of itsown.CS: technicalstandards26.30(b): CS-26 ortechnical standardsoffering an equivalentlevel of safety mayshow compliance.adoptsadoptsadoptsadoptsEasy Access RulesEASA FAQUnofficial consolidationCopies rule and decision texts for navigation. Checkits cut-off and later official amendments.Dated contextAn answer to a recurring question. Useful and notbinding.
Figure 1.1. Commission Regulations and EASA decisions have separate adoption paths; compiling their texts does not merge their status. For production organisations and Subpart F manufacturers, alternative means under 21.A.134A and 21.A.124A require competent-authority approval before use.

Worked example. The certification planner at Example Design Ltd checks handbook AV-HB-01 revision 4 for a regional turboprop change. She marks 21.A.91 as the binding classification test and GM 21.A.91 as guidance supporting her recorded judgement. She then checks the Official Journal text and applicable amendments before releasing the handbook. A helpful GM example supports the decision; it does not create an extra legal test.

Handbook review entry: “AV-HB-01 rev 4: 21.A.91 = binding classification criteria; GM 21.A.91 = explanatory examples. Release held until the source register identifies the applicable official text.”

Reading the Easy Access Rules

EASA's Easy Access Rules (EAR) put the regulation, AMC and GM for one subject into one book. The editor's key uses blue headings for implementing rules, amber for AMC and green for GM, and prints in italics under each title the regulation or ED Decision through which that item was introduced or last amended. EASA states that the book is not an official publication; when it differs from the Official Journal, the Official Journal text applies.

A worked example shows why the cut-off date matters. The Part-21 EAR revision published on 2025-11-28 incorporates amendments up to Regulation (EU) 2025/2293 and ED Decision 2025/016/R (AMC and GM Issue 2, Amendment 17). Regulations (EU) 2026/56 and 2026/100 were published in the Official Journal on 2026-01-19 and apply from 2026-08-07, and ED Decision 2026/005/R was signed on 2026-07-03 and published on 2026-07-06. A certification planner who worked only from that EAR in 2026-09 would read the superseded 21.A.174 and 21.A.179 and would still find the old airworthiness review certificate form in Appendix II. The book's list of incorporated amendments shows the gap; the word "current" on a website does not.

EASA FAQ: Can an FAQ create a legal requirement?

The question. A design-office reviewer wants to turn an EASA FAQ into a mandatory handbook rule. Does the answer itself have legal force?

Decide first, then open EASA's answer

EASA's answer, in brief. FAQs express EASA's technical understanding, rather than binding legal interpretations. Interpretation of EU law rests with the courts, ultimately the Court of Justice of the European Union.

What it means at work. In handbook AV-HB-01, identify the underlying regulation and applicable conditions before writing a duty. Keep the FAQ as supporting explanation, with its date; do not use it to add a requirement or waive one.

Source: EASA, Can the information provided in EASA’s FAQ be considered legally binding? (FAQ 19115), checked 2026-11-17. Paraphrased; read with the rules as amended to this course's regulatory basis.

Regulatory basis: what this course includes

This course teaches the sources below as amended up to the act or decision shown. Anything published after it is not part of this edition of the course.

Each source and the amendment, edition or decision this course includes
SourceIncluded up to
Regulation (EU) No 748/2012 — Annex I (Part-21)Delegated Regulation (EU) 2026/56 and Implementing Regulation (EU) 2026/100 (applicable from 2026-08-07)
Regulation (EU) 2015/640 — Annex I (Part-26)Implementing Regulation (EU) 2024/2954 (applicable from 2024-12-22, some points later)
AMC & GM to Part-21ED Decision 2026/005/R (Issue 2, Amendment 18)
CS-26 and its GMED Decision 2024/010/R (Issue 5; file corrected 2026-06-17)

Checked against the official texts on 2026-11-22. Before relying on a point at work, check the current consolidated text on EUR-Lex and the AMC & GM currently published by EASA, including any later ED Decision.

A five-step check before you rely on a rule

Run the same five steps whether you are writing a handbook or answering a stores query. Lesson 18 repeats the check as a currency gate for your whole source pack.

  1. Name the person or organisation and the product: design holder, producer, operator, owner or competent authority, and the aircraft or part concerned.
  2. Find the binding point and read every condition in it, including the points it cross-refers to.
  3. Read the cover regulation Articles for scope, definitions and transitional provisions; many applicability answers sit there rather than in the annex.
  4. Record the incorporated amendments, the entry into force and each application date, then search EUR-Lex and the EASA register for newer material published after the EAR cut-off.
  5. Only then read the AMC, GM or CS that support the point, and note in your record which level each statement comes from.

At work: label the source before writing the procedure

  1. List and label the sources

    Open the project handbook and list each legal requirement, AMC method, GM explanation, CS test standard and FAQ used in the decision. Put the exact point, amendment or file identity beside it; a link to an unlabelled PDF is insufficient.

  2. Compare the handbook wording

    Compare the legal text and its application date with the proposed handbook wording. Check that an explanation has not become an extra obligation and that the selected technical standard is being used for the right purpose.

  3. Resolve the source gap

    Keep the decision and source record together. If the source pack is incomplete or conflicting, resolve that specific gap with the appropriate airworthiness or compliance function before releasing the procedure for use.

Mid-course quiz Ungraded practice

A project handbook mixes rule levels

3 questions · Retry freely · Separate from your final exam

Choose an action, check its consequence and explore the alternatives. Your practice answers are not saved.

Your scenario · Fictional training example

Fictional training example. In 2026-09, Example Design Ltd reviews a project handbook before release. The handbook calls the examples in GM 21.A.91 "mandatory classification rules", uses a CS-26 test method to decide which aircraft a Part-26 point covers, and cites the 2025-11 Easy Access Rules as its only source for 21.A.174.

Key references
Regulation (EU) 2018/1139 Article 76(3); Regulation (EU) No 748/2012 Article 10; 21.A.124A; 21.A.134A; 26.30; CS 26.1
How should the handbook describe the GM 21.A.91 examples?
Compare all answers and explanations

As guidance that illustrates the binding criteria of 21.A.91; the classification itself rests on 21.A.91. — Best choice.
GM explains and illustrates the rule. It has no compliance status of its own, so the binding test remains the 21.A.91 criteria.

As binding criteria, because EASA adopted them in the same ED Decision that adopts the AMC to Part-21 itself. — Consider the consequence.
Being adopted by ED Decision does not make guidance binding. Only the implementing rule in the Commission Regulation binds.

As acceptable means of compliance, because following them creates a presumption that 21.A.91 is met. — Consider the consequence.
GM and AMC are different levels. AMC is an accepted way to comply; GM only explains, and these examples are labelled GM.

What decides which aircraft the Part-26 point covers?
Compare all answers and explanations

The CS-26 test method, because CS-26 is the standard means of showing compliance with Part-26. — Consider the consequence.
CS-26 tells you how compliance may be shown. It does not set the cohort; 26.30 even allows equivalent technical standards instead.

The EASA FAQ on Part-26 applicability, because it summarises the scope of every point in one answer. — Consider the consequence.
FAQ 104998 says the opposite: each point names who it affects. An FAQ is dated, non-binding context.

The applicability conditions written in the Part-26 point itself, such as category and dates. — Best choice.
Each Part-26 point states its addressee and cohort. The test method is chosen only after the point has been found to apply.

What is wrong with citing only the 2025-11 Easy Access Rules for 21.A.174?
Compare all answers and explanations

It is an unofficial compilation, so it may never be cited in a handbook even for orientation. — Consider the consequence.
The EAR is a legitimate navigation tool and may be cited, as long as its cut-off date is recorded and later amendments are overlaid.

It predates Regulation (EU) 2026/56, which replaced parts of 21.A.174 from 2026-08-07. — Best choice.
The 2025-11 book incorporates amendments only up to Regulation 2025/2293. The amended 21.A.174 must be read in the Official Journal.

It omits ED Decision 2026/005/R, which replaced the text of 21.A.174 itself in 2026-07. — Consider the consequence.
An ED Decision adopts AMC and GM; it cannot change a regulation. The rule change came from Delegated Regulation (EU) 2026/56.

Sources checked 2026-11-17. Correction sources rechecked 2026-11-18. Regulation (EU) No 748/2012, Part-21: provisions and appendices cited in this lesson; Regulation (EU) 2015/640, Part-26 and supporting CS-26; ED Decision 2026/005/R, Part-21 AMC/GM Issue 2 Amendment 18; EASA FAQ 19115.; ED Decision 2026/005/R, signed 2026-07-03. Fictional identifiers and measurements illustrate decisions; they are not approved aircraft data.

Continue with lesson 2: The cover Regulations and the 2026 amendments

€85 per seat + VAT where applicable

Get the syllabus by email

Not ready to buy? We email you the printable syllabus, the free lesson and the course page.

Continue?

Help & feedback

Get guidancePrepared answers about buying, learning and certificates.

For questions about lesson content, open Ask Metis inside that lesson.

Submitted feedback is stored. If you request a reply, your reply email is stored.